What happened

ATSB summary, verbatim

Rescue hoist cable failure involving AS 350 B3, VH-UAH, 1 km south-west of Bulga, New South Wales, on 5 February 2020 (Infrastructure - Other) What happened On 4 February 2020, an Airbus Helicopters AS 350 B3 was being operated in support of New South Wales National Parks and Wildlife Service activities. Winching of personnel and equipment was being conducted when the operating crewman detected a technical issue with the load cable of the hoist system fitted to the helicopter. The outer strands of the cable toward its termination into the hook assembly had loosened in respect of the inner core. During a subsequent hoist operation to restore the cable integrity, the cable fractured at the hook assembly while under load, releasing the weight bag and hook assembly to the ground. There was no damage to the helicopter or injuries to personnel. What the ATSB found The ATSB found that variations in the operator’s stowage practices over an extended period of winching operations led to inadequate compression of the hook assembly and subsequent wear to the load cable. The wear damage was due to vibration and movement of the hook assembly during periods of helicopter operation. This led to a significant reduction in the cross-sectional area of the cable, fatigue and fracture of the strands and an associated reduction in cable strength. It is likely that specific post-flight inspection requirements for the Breeze Eastern rescue hoist required in the Civil Aviation Safety Authority (CASA) Airworthiness Directive AD/SUPP/10 were not being adequately completed by the operator. The inspections were targeted at minimising wear damage to the load cable by ensuring correct stowage of the hook assembly at the end of each flight. Finally, the operator’s method of cycle counting during operation of the rescue hoist led to an accumulation of cycles that significantly exceeded the helicopter manufacturer’s recommended life-limit. That exceedance probably compounded the level of wear damage sustained to the load cable. What has been done as a result The New South Wales National Parks and Wildlife Service (ParkAir) implemented a range of pro‑active safety actions since the occurrence, including: • In July 2020, ParkAir provided Breeze-Eastern Flight Line maintenance training for all staff including pilots, maintainers and rescue hoist crewman. • A measurement gauge is now used by crewman to determine whether the hoist has adequate compression in accordance with the pre- and post-flight requirements listed within CASA Airworthiness Directive AD/SUPP/10. • In January 2021, a revision of the ParkAir Flight Manual Supplement was accomplished to ensure cable inspection procedures requirements are now completed in accordance with CASA Airworthiness Directive AD/SUPP/10. • ParkAir have adopted the more conservative Airbus Helicopters method for hoist cycle counting and all hoist cables now have a 500 cycle life-limit. Additionally, as a direct result of this occurrence and the release of ATSB’s Safety Advisory Notice SAN-2020-013-001 , the following pro-active safety advice was released by organisations responsible for the design, manufacture, and regulation of helicopter rescue hoist systems: • Breeze-Eastern Service Information Letter (SIL 14 Maintenance) Breeze-Eastern Rescue Hoist Maintenance & Flight Line Inspections for BL-29700 Series , release date 6 April 2020 • CASA Airworthiness Bulletin (AWB) 25-034 Helicopter Rescue Hoist Wire Rope – Wear, Fatigue and Failure , release date 22 April 2020 • Airbus Helicopters Safety Information Notice (SIN) 3507-S-25 Fatigue failure of a BREEZE 450 Lbs hoist cable , release date 4 June 2020 • European Aviation Safety Agency (EASA) Safety Information Bulletin (SIB) 2020-11 Helicopter Rescue Hoist Cable Failure , release date 11 June 2020. Safety message The ATSB advises all helicopter operators and flight crew involved in rescue hoist operations to review their current operational practices to ensure hoist operation and hook stowage are in accordance with the manufacturers’ published procedures. In addition, it is recommended that the pre- and post-flight inspection requirements of the hook and cable assembly, along with any recurring scheduled maintenance of the hoist system are closely reviewed, to ensure that they are completed in accordance with the manufacturers’ instructions. Improper stowage of the hoist hook assembly can lead to excessive movement and accelerated wear of the cable, which if undetected, could have a fatal outcome. Should any load cable exhibit an increased frequency of outer strand loosening requiring a condition operation, operators should be particularly mindful to check for narrowing or ‘necking’ of the cable at the ball end within the swivel hook assembly. This can signify that the cable has become damaged due to extreme wear and may no longer be safe to use. Summary video

Findings

the ATSB's findings: contributing factors and other factors that increased risk, verbatim
Findings From the evidence available, the following findings are made with respect to the rescue hoist cable failure from an AS350 B3 helicopter that occurred on 5 February 2020. Contributing factors • While the helicopter crew were conducting a conditioning maintenance operation of the hoist system, the hoist cable fractured, which allowed the suspended load to fall to the ground. • Wear damage from in-service movement of the hook assembly led to a significant reduction in cross-sectional area, fatigue and overstress fracture of the strands and an associated reduction in cable strength. The wear was probably compounded by the extended age of the cable and accumulated load cycles. • Variations in hook stowage practices following winching operations led to inadequate compression of the hook assembly. This probably led to the winch cable becoming damaged due to wear as the hook assembly vibrated and moved during helicopter operation. • It is likely that specific post-flight inspection requirements for the Breeze‑Eastern rescue hoist listed in Airworthiness Directive AD/SUPP/10 were not adequately completed by the operator. The inspections were targeted at ensuring correct stowage of the hook assembly at the end of each flight. (Safety issue) • The operator’s method for cycle counting during operation of the rescue hoist led to an accumulation of cable load cycles that exceeded the 500-cycle life-limit recommended by Airbus Helicopters.

Safety recommendations

1 issuedwhat changed because of this accident
  • AO-2020-013-SI-01issued

    1, Helicopter Personnel Winching - Human External Cargo (HEC) Operations, 25 April 2015 Helicopter Rescue Techniques, Civilian Public Safety and Military Helicopter Rescue Operations, United States Department of the Interior National Park Service, National SAR Academy (NSARA), First edition October 2013 Information on Helicopter Hoist Wire Rope, Failure Modes, and Rejection Criteria, Zephyr International IIc 2013 James Paul WALLIS, The importance of cable care, AirMed & Rescue Magazine, 4 June 2019 Kasim TURGAT et. al. Falls from height: a retrospective analysis, World Journal of Emergency Medicine, 2018 pp46-50 US Department of Defence, Wire Rope – Steel - Nonrotating for Aircraft Rescue Hoist, Military Specification MIL-W-83140 April 1969. Washington, DC Submissions Under section 26 of the Transport Safety Investigation Act 2003 , the ATSB may provide a draft report, on a confidential basis, to any person whom the ATSB considers appropriate. That section allows a person receiving a draft report to make submissions to the ATSB about the draft report. A draft of this report was provided to

In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.