Airbus A320-232Jetstar Airways
Sydney Airport, New South Wales · 2018-09-20·VH-VGZ
What happened
ATSB summary, verbatimEngine thrust reverser malfunction involving Airbus A320, VH-VGZ, Sydney Airport, NSW, on 20 September 2018 (Engine failure or malfunction) What happened On 20 September 2018, at about 1620 Eastern Standard Time [ 1 ] , an Airbus A320, VH‑VGZ, operated by Jetstar departed Brisbane Airport, Queensland, on a scheduled passenger flight to Sydney, New South Wales, with six crewmembers and 178 passengers on board. During the landing roll, the flight crew selected both engines to ‘reverse thrust’ and received an Electronic Centralised Aircraft Monitor (ECAM) ‘reverse fault’. The captain called, ‘no reverse’ and the first officer completed the landing utilising normal braking. The flight crew taxied the aircraft off the runway at the planned exit. The captain later recalled that, during the pre-flight checks, he had not observed any indications on the engine cowls, in the cockpit or on the technical log to show that the thrust reversers were de-activated. There was no damage to the aircraft, or injuries sustained during the incident. Engineering inspection Following the incident, an engineering inspection revealed that the thrust reversers were in the de‑activated position; with the minimum equipment list (MEL) lockout pin installed (Figure 1). The lockout pins were removed from each of the engines, thrust reversers were tested and found to be serviceable, and the aircraft was returned to service. Figure 1: MEL lockout pin installed in thrust reverser hydraulic control unit (HCU) Source: Operator, annotated by the ATSB Maintenance prior to the incident flight; On 17 September 2018, VH-VGZ arrived at the Qantas maintenance facility in Brisbane, Queensland. The aircraft was scheduled for a three-day maintenance check and was due to return to service at 2040 on 20 September 2018. Two days into the maintenance, the engineers identified that the horizontal stabiliser actuator required replacing, which added half a day of work to the schedule. To recover the lost time, a team was organised to begin work at 0400 the following day. At about 0600 on 20 September 2018, the actuator replacement was completed and the team proceeded to finalise the remaining scheduled maintenance tasks. At about 0840, a licenced aircraft maintenance engineer (LAME) completed and certified the task card for a required thrust reverser functional check. Based on the system test of the thrust reversers, but contrary to the required procedure, he also completed the certification for the same check on the ‘hangar release’ task card. The check coordinator (CC) instructed the engineering team to return all equipment to the tool crib, so that he could complete signoffs on the work packages. Two hours later, the CC received a call from Jetstar to inform him that the aircraft departure time had been brought forward to 1620. The CC assessed the request based on outstanding workload, certification and resource requirements and accepted the reschedule. The CC communicated the new schedule to the engineering team. To avoid a shift handover during the final maintenance signoffs, the CC instructed the engineers to complete the maintenance by the end of first shift at 1500. Due to the compressed schedule, many of the engineers worked through their lunch breaks to ensure they could complete the maintenance on time. After completion of the engine ground run checks, the engineers discussed the remaining maintenance items on the ‘hangar release’ task card (Figure 3), giving consideration to the limited time remaining. The engineers noted that: • the thrust reverser functional check was not a requirement in the aircraft maintenance manual (AMM) following the engine leak check • the functional check on the hangar release card had already been signed concurrently with the thrust reverser functional check completed earlier that morning. On that basis, and with consideration to the remaining time, the engineers decided that they did not need to repeat the functional check on the thrust reversers after completing the engine leak checks. That was contrary to the requirements associated with releasing the aircraft back to service (see the section titled Maintenance procedures ). Shortly after, the engineers pushed the aircraft out of the hangar to complete the final checks, which included the engine leak checks. The AMM engine leak check procedure required the left and right engine thrust reversers to be de‑activated. The de-activation procedure specified the use of warning notices in the cockpit and a lockout pin with a red warning flag attached (Figure 2). The AMM lockout pin was located in the tool crib. Checking out the AMM lockout pin from the tool crib would have resulted in delays to the closure of the work package as that could only be done when all tools were checked back in. The MEL lockout pin, which was functionally the same but did not have a warning flag attached, was located inside the engine cowling. In an effort to keep to schedule, the engineers decided to use the MEL lockout pin as a substitute. The engineers did not put additional warning notices in the cockpit for thrust reverser de-activation as they considered the ‘maintenance in progress’ notice to satisfy the AMM requirement. The installed MEL lockout pins were not identified following completion of the engine leak check procedure. Consequently, both engine cowlings were closed with the lockout pins in place and the thrust reversers inoperative. Figure 2: Lockout pin with warning flag Source: Operator At about 1240, 3 hours and 40 minutes prior to the incident flight, the final paperwork was completed and the engineers released VH-VGZ to service. Maintenance procedures A typical work order for any maintenance check contained a number of ad hoc task cards that were required to be completed and certified to record the work done. During aircraft maintenance checks, ‘non-routine’ task cards could be raised by the engineers to complete defect rectification or other work resulting after carrying out inspection tasks of the check’s work pack and/or technical log defects. The ad hoc task card for the hangar release check , contained a note regarding the importance of completing all post-maintenance checks as standalone tasks; and provided an order of jobs to be completed sequentially (Figure 3). Figure 3: Operator’s task card for A320 hangar release check Source: Operator, annotated by the ATSB Engineers’ comments The maintenance engineers provided the following comments after the incident: • During the final maintenance tasks, some of the engineers reported feeling tired as a result of a combination of factors including: early start times skipped meal breaks circumstances outside work, which had limited their ability to get quality sleep the previous evening. • early start times • skipped meal breaks • circumstances outside work, which had limited their ability to get quality sleep the previous evening. • Each of the engineers felt a sense of responsibility and pressure to provide on-time performance to the customer. • The schedule compression and increased pressure for on-time performance influenced their decision to use the MEL lockout pin, as it would not delay the completion of the maintenance paperwork. • At the start of the maintenance check, the engineers placed a generic ‘maintenance in progress’ warning notice over the controls in the cockpit. The generic warning notice was considered by some of the engineers to concurrently satisfy the requirement in the individual AMM tasks to place specific warning notices over the controls. Qantas’ comments Following an internal review of the incident, Qantas provided the following comments: • The individuals involved in this occurrence were all working in compliance with the maintenance organisations’ approved fatigue management framework. • The awareness of following the AMM safety precautions steps, such as placing specific warning notices over the controls, at the Brisbane base was not as robust as it should be. Safety message Operational pressures are a reality of the aircraft industry, with aircraft delays having a substantia
Findings
the ATSB's findings: contributing factors and other factors that increased risk, verbatimFindings These findings should not be read as apportioning blame or liability to any particular organisation or individual. • Deviation from the required maintenance procedures resulted in the aircraft being returned to service with the thrust reverser system inadvertently deactivated. • Operational pressure to expedite the maintenance probably influenced the engineers’ decision to deviate from the written procedures.
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.