Sikorsky Aircraft S-92A
Broome, Western Australia · 2016-11-10·VH-ZUQ
What happened
ATSB summary, verbatimFailure of main rotor system involving Sikorsky S92, VH-ZUQ, Broome, WA on 10 November 2016 (Propeller/rotor malfunction) What happened On 10 November 2016, a Sikorsky S-92A helicopter, registered VH-ZUQ (ZUQ), was scheduled to fly from Broome Airport, WA, to an offshore facility. The flight crew consisted of a pilot flying (PF) in the right crew seat, and pilot monitoring (PM) in the left crew seat [ 1 ] . The PM was undergoing conversion training on the S-92A. During the start procedure, the flight crew reported feeling abnormal vibrations in the airframe. The crew believed this might have been the result of a crosswind or recent maintenance work performed on the aircraft, and the PF attempted to minimise it by adjusting the cyclic control. At approximately 1215 Western Standard Time (WST), a member of the ground crew showed the pilots an anti-flap stop that had broken off the main rotor head. Figure 1 shows the recovered anti-flap stop and securing hardware. Figure 2 shows the anti-flap stop attached to the main rotor hub. The helicopter was subsequently shut down. Further inspection revealed that two anti-flap stops had been sheared off the main rotor head during start-up. One of the stops landed next to the aircraft, while the other struck one of the main rotor blades and narrowly missed a member of the ground crew. It was recovered 45 metres from the aircraft. Figure 1: Anti-flap stop and securing hardware Source: Operator Figure 2: Anti-flap stop secured to the main rotor hub Source: Operator The damage to the anti-flap stops was found to have been the result of the PM not lowering the collective control lever at the appropriate time during the engine start. The raised collective resulted in the blades lifting upward, placing abnormal stresses on the anti-flap stops (which are designed to limit upward movement of the blades). This behaviour resulted in the vibrations experienced by the crew. Events leading up to the broken anti-flap stops The flight crew had flown together on each of the three days leading up to the serious incident. In all three flights, the pilots were acting in the opposite roles compared with the incident flight. The PM on the day of the incident had never flown an S-92 in that role before. On the day of the serious incident, the crew arrived approximately two hours before the scheduled take-off. This was in accordance with base instructions that required at least 90 minutes for flight planning and pre-flight inspections. However, the PM was required to make a phone call to the company’s flight operations department and the crew were then involved in a discussion regarding the PM’s further training requirements. The flight crew were also required to ‘shadow plan’ [ 2 ] and perform the pre-flight inspection on a second aircraft, to ensure the flight could proceed in the event that ZUQ was unable to fly. According to the operator’s daily flying roster, the base pilot-in-command (PIC) was originally rostered on to be part of the backup crew. However, client obligations on the base prevented the PIC from being available in the event of the backup crew being required. The PF and PM were not aware of this prior to arriving that day, so they had not given themselves additional time to prepare a second aircraft before departure. Prior to departure, the PF was tasked with pre-flight inspections of ZUQ as well as the backup aircraft, but they were delayed as maintenance activities were still being conducted on ZUQ. In addition, flight data from ZUQ’s previous flight had not yet been downloaded and analysed, further delaying the PF. Flight crew comments Both the PF and PM felt time pressure compounding from the morning’s events. Given that, in accordance with the base rules, 90 minutes is required to prepare for a single flight and considering the number of distractions and delays encountered that morning, the crew felt that more time was required to adequately plan and prepare for both flights. As a result of feeling rushed and to ensure that they were fully prepared for the flight, they completed a second threat and error review, rechecked the flight plan together, rechecked the helicopter’s technical log and walked to the helicopter together. The flight crew perceived a significant amount of pressure from the operator’s client for this flight. They believed that this client, more than any other they were aware of, required flights to adhere to strict schedules. Engine start procedures For engine starts with the rotor brake off, as were normally performed by this operator, the collective must be lowered as part of the start sequence. According to the operator’s standard operating procedures, the PF starts the number 1 engine first, and brings the throttle to idle. When the rotational speed of the main rotor is over 20%, and the hydraulic pressure reaches an appropriate level, the procedures state that the collective is to be moved to the full down position. The PF then starts the number 2 engine. The S-92A was the only helicopter in the operator’s fleet that required the collective to be lowered as part of the start sequence. It was also the only helicopter where responsibility for controls was split between the two pilots. The operator’s procedures did not designate the task of lowering the collective to either the PM or PF. However, the operator’s parent company uses procedures that specifically assign the role to the PM. Despite not being contained in the operator’s procedures, both pilots understood that it was the role of the PM to lower the collective during engine start and this had been briefed prior to the engine start. Operator’s investigation Immediately after the serious incident, the operator commenced its own safety investigation. It identified that the PM had not lowered the collective at the appropriate time during the start procedure. A number of factors were identified. Some of these are listed below: • Within the operator’s fleet, the requirement that the PM, rather than the PF, lower the collective is unique to the S-92A. • During the S-92A start procedure, there is no documented requirement for a call out and challenged response between the flight crew to ensure the collective is lowered. • The PM had been serving as PF for the last three flights the crew carried out together. Safety message This incident is an example of what can occur when pressure associated with on-time departures is compounded with the absence of clear operating procedures. It is important that pilots have detailed and specific instructions on which to fall back when they feel pressure beginning to build. __________ • While roles may vary between operations, the pilot flying is primarily responsible for handling the aircraft. The pilot monitoring monitors the pilot flying and is usually responsible for other tasks such as radio calls. • Shadow planning refers to creating a completely separate flight plan for another aircraft. • Rotor brake starts make it easier for a single pilot to operate all controls, as the engines can be started before control input is required.
Findings
the ATSB's findings: contributing factors and other factors that increased risk, verbatimFindings These findings should not be read as apportioning blame or liability on any organisation or individual. • A series of events resulted in the flight crew having more tasks to complete than originally planned, and less time in which to complete them. This resulted in time pressure on the crew. • The PM's unfamiliarity with the unique starting procedures in the S-92A compared with other helicopters contributed to the collective not being lowered in time. • The operator's standard operating procedures did not require any call outs for the lowering of the collective, which probably contributed to the collective not being lowered in time. • With regard to start-up, the operator's standard operating procedures do not provide an explicit division of tasks between the PF and PM.
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.