Bombardier Inc DHC-8-315Eastern Australia Airlines
near Adelaide Airport, SA · 2015-04-24·VH-TQM
What happened
ATSB summary, verbatimAircraft control issues involving a Bombardier DHC-8, VH-TQM near Adelaide Airport, South Australia on 24 April 2015 (Control - Other) Summary Updated: 19 October 2015 Completion of the draft investigation report has been delayed due to workload and competing priorities. The draft report is anticipated for release to directly involved parties (DIP) for comment in March 2016. Feedback from those parties over the 28-day DIP period on the factual accuracy of the draft report will be considered for inclusion in the final report, which is anticipated to be released to the public in May 2016. ___________ The ATSB has commenced an investigation into aircraft control issues involving a Bombardier DHC-8, VH-TQM, near Adelaide Airport, South Australia on 24 April 2015. During approach to runway 30 in instrument meteorological conditions, the airspeed reduced below the optimal approach speed and the crew adjusted the power to regain airspeed. The flight director failed during the approach. The crew received two ground proximity warnings. As part of the investigation, the ATSB will interview the flight crew, obtain flight and air traffic surveillance data and gather additional information. A report will be released within several months.
Findings
the ATSB's findings: contributing factors and other factors that increased risk, verbatimFindings From the evidence available, the following findings are made with respect to an enhanced ground proximity warning system warning involving a Bombardier DHC-8 aircraft, registered VH-TQM, near Adelaide Airport, South Australia on 24 April 2015. These findings should not be read as apportioning blame or liability to any particular organisation or individual. Contributing factors • During approach, for reasons that could not be established, uncommanded disengagement of the aircraft's flight director and vertical navigation mode occurred. • Contrary to the operator’s procedure, the approach was continued following disengagement of the flight director. That was probably due in part to an expectation that it would automatically re-engage in a similar manner to that experienced on previous flights that day. • During manual re-engagement of the flight director during a period of high workload and focus on other tasks, vertical speed mode was engaged without the knowledge of the pilot flying. As a result, the vertical flight path protection provided by the vertical navigation mode was removed. • A combination of the unrecognised vertical speed mode selection and the relatively high captured descent rate resulted in descent below a minimum safe altitude and activation of an obstacle proximity warning. Other factors that increased risk • The pilot flying conducted a missed approach instead of a terrain avoidance procedure in response to the obstacle proximity warning, which reduced the obstacle clearance margin of the aircraft's flight path. The use of an incorrect procedure was probably due to high workload at the time. • Flight director dropouts had occurred previously and not been reported by company flight crew, probably due to acceptance (or normalisation) of the faults. This non-reporting affected the operator's ability to resolve the issue and to educate flight crew about it. • The Adelaide induction material and route manual provided to the crew did not include information on the hazards of the RNAV-Z runway 30 approach, including its steep flight path and proximity to the obstacle. Other findings • The tower height as shown on the approach chart (1,316 ft) was 49 ft lower than its actual height. While the incorrect height was also in the terrain database for the enhanced ground proximity warning system (EGPWS), it did not affect the activation of the EGPWS obstacle warning. › 14 ‹ ATSB – AO-2015-045
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.