FlarePath
ATSB AO-2014-043 · ATSB (Australia) · Occurrence Investigation

Airbus A320Tiger Airways

Sydney Airport, NSW · 2014-03-03·VH-VNJ

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
—
serious
No injury
highest injury
NONE
damage

What happened

ATSB summary, verbatim

Pre-flight / Planning event involving an Airbus A320, VH-VNJ at Sydney Airport, NSW on 3 March 2014 (Aircraft preparation) Summary Updated: 30 November 2015 Completion of this investigation has been delayed by the involvement of the investigator in charge on other aviation safety investigations and tasks. It is anticipated that the draft investigation report will be released to directly involved parties (DIP) in March 2016 for comment on the factual accuracy of the draft. Any DIP comments over the DIP period will be considered for inclusion in the final report, which is expected to be released to the public in early June 2016. ________________ On the evening of 3 March 2014, an Airbus A320 (A320) aircraft, registered VH-VNJ, was being operated on a scheduled passenger service from Sydney Airport, New South Wales to Perth Airport, Western Australia. The flight crew had operated the aircraft on two previous sectors that evening. They landed in Sydney ahead of schedule from the previous sector, arriving at the gate at 2105 Eastern Daylight-saving Time. [1] As part of their preparations for the flight to Perth, the crew reviewed the flight plan prepared earlier that day by the operator’s Operations Control Centre. The crew identified that the flight plan did not include the weight of passengers or cargo. [2] In response, the crew: • included the payload in the aircraft’s load and trim sheet • loaded additional fuel • used the updated fuel figure and payload to prepare the take-off data card for the departure • calculated the correct V speeds for the take-off [3] • continued their flight preparation with the original flight plan. This plan recorded 13,520 kg of fuel on board prior to engine start. The aircraft commenced its take-off roll for Perth at 2210. The forecast weather conditions for Perth Airport and other aerodromes to which the A320 could operate en route were fine. There were no weather-related requirements for holding fuel. The original flight plan predicted a total fuel burn for the flight (excluding reserves) of 9,568 kg. The actual fuel burn recorded for the flight was 11,590 kg. The aircraft landed in Perth with about 1,900 kg of fuel remaining. The investigation is continuing. This will include: • a review of the preparation and distribution of the original flight plan • the operator’s procedures for the generation of a revised flight plan • confirming the reason for the increased fuel burn. Completion of this investigation has been delayed by the involvement of the investigator in charge on other competing aviation safety investigations and tasks. It is anticipated that the draft investigation report will be released to directly involved parties (DIP) in November 2015 for comment on the factual accuracy of the draft. Any DIP comments over the 28-day DIP period will be considered for inclusion in the final report. ___________________ The information contained in this web update is released in accordance with section 25 of the Transport Safety Investigation Act 2003 and is derived from the initial investigation of the occurrence. Readers are cautioned that new evidence will become available as the investigation progresses that will enhance the ATSB's understanding of the accident as outlined in this web update. As such, no analysis or findings are included in this update. [1] Eastern Daylight-saving time (EDT) was Coordinated Universal Time (UTC) + 11 hours. [2] An aircraft’s payload is that part of its useful load that can be used to derive revenue. During a scheduled passenger service this can include passenger and cargo weights. [3] Take-off reference speeds or V speeds assist pilots to determine when a rejected take-off can be initiated, and when the aircraft can rotate, lift off and climb.

Findings

the ATSB's findings: contributing factors and other factors that increased risk, verbatim
Findings From the evidence available, the following findings are made with respect to the flight planning error involving Airbus A320 registered VH-VNJ that occurred at Sydney airport, New South Wales, on 3 March 2014. These findings should not be read as apportioning blame or liability to any particular organisation or individual. Contributing factors • On identifying that the operational flight plan for the Sydney to Perth sector had been based on an incorrect aircraft weights, resulting in the fuel calculation and subsequent fuel plan being significantly in error, the aircraft captain chose to re-calculate the required fuel load using resources available on the flight deck. The required fuel load calculated and uplifted did not include the operator's requirement to carry a '60 minute top-up' additional fuel, resulting in the aircraft departing with a fuel load that was below that required under the company's operations manual. • There were deficiencies within the processes and procedures used by the operator's Operational Control Centre that permitted incorrect operational flight plans to be produced and subsequently provided to flight crew. • The operator provided limited guidance and assistance for flight crews on the processes and procedures for correcting identified fuel planning errors. For the occurrence flight crew, this lack of guidance, as well as the remoteness of resources that could assist, resulted in the decision to determine a correct required fuel load calculation using only those resources available on the flight deck. Other findings • All company and regulatory in-flight fuel requirements for the flight from Sydney to Perth were met, and the aircraft landed with fuel in excess of the required fuel reserves. › 9 ‹ ATSB – AO-2014-043
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.