The Boeing Company 737Virgin Australia
Melbourne Airport, VIC · 2013-08-10·VH-YID
What happened
ATSB summary, verbatimCollision during pushback operations between Boeing 737-8FE, VH-YID and Airbus A320-232, VH-VGR, Melbourne Airport, Victoria, 10 August 2013 (Taxiing collision/near collision) Summary Updated: 9 June 2015 The draft investigation report is being finalised and is anticipated for release to the directly involved parties (DIP) for comment in July 2015. Feedback from those parties over the 28-day DIP period on the factual accuracy of the draft report will be considered for inclusion in the final report, which is anticipated to be released to the public in September 2015. Updated 30 August 2013 On 10 August 2013 at 0933 Eastern Standard Time, a Boeing Company B737-8FE (B737) VH-YID was being pushed back from gate E1 at Melbourne Airport terminal (see apron diagram below). An Airbus Industrie A320-232 (A320) VH-VGR was stationary on a taxi line, behind and to the left of the B737, waiting to dock at gate D2. During the pushback a collision occurred between the B737 and the A320. The ATSB investigation has examined the aircraft involved and the location of the collision, and has conducted interviews with the flight crew, ground support staff, and an air traffic controller. Data and voice recordings have been obtained from the aircraft, radar data and voice recordings from air traffic control, and video recordings from the airport operator. The B737 was being pushed back by a tug, using a towbar connected to the nosewheel to steer and push the aircraft. The pushback was being controlled by a dispatcher who was walking beside the aircraft on the right side, wearing a headset connected by cable to a socket on the right side of the aircraft and in communication with the pilot in command seated on the left side of the cockpit. The copilot, seated on the right side of the cockpit, was communicating with the surface movement controller in the Melbourne air traffic control tower. The ATSB determined that the left wing could not be seen from the dispatcher’s position, and the flight crew reported they could only see the wingtips with difficulty from the cockpit. The B737 had been approved by the surface movement controller to push back from gate E1 once the A320 was ‘on the gate’ for gate D2. The B737 flight crew reported they relayed the pushback approval to the dispatcher including the caveat of ‘once VH-VGR was on the gate’. The dispatcher recalled that he looked under the B737 fuselage and after he had observed the A320 stopped for some time and believing that the aircraft was on the gate, initiated the pushback. The tug driver concentrated on directional control to keep the B737 following the marked lines for the pushback. The ATSB determined that from the dispatcher’s viewpoint it was not possible to see the clearance line 1 for gate D2, or to see enough to ensure that an aircraft was on the gate at D2. At the time of the conditional push-back clearance being issued to the crew of the B737, the A320 was taxiing towards gate D2 after landing. The A320 flight crew reported that as the aircraft approached gate D2, the automatic visual guidance display system changed its display to ‘STOP WAIT’. The aircraft was stopped about 20 m before its intended parking position and the tail had not passed the clearance line for gate D2. The crew notified the surface movement controller that they had stopped short; however, that transmission was over-transmitted and was not heard by the controller or the crew of the B737. About 40 seconds later the A320 crew transmitted the same message, which was acknowledged by the controller, who requested that they report when the aircraft was ‘on the gate’. The flight crew of B737 stated they were not aware of the communication between the A320 and the surface movement controller, although they were monitoring that radio frequency. About 30 seconds later the left wingtip of the backwards travelling B737 collided with the tailcone of the stationary A320, rear of the auxiliary power unit mounted in the tailcone. The left winglet of the B737 was damaged and the tailcone rear of the auxiliary power unit and the exhaust duct separated from the A320. The A320 was then manually marshalled to gate D2, and the B737 was towed back to gate E1. The Aeronautical Information Publication (AIP) states that separation of aircraft on taxiways is the joint responsibility of air traffic control and pilots. Avoidance of collision between aircraft on apron areas is the joint responsibility of the pilot in command and assisting company ground personnel with air traffic control providing information about other aircraft moving on the apron areas. The surface movement controller, situated about 1.5 km away in the Melbourne Airport control tower, was responsible for providing clearances to traffic moving on taxiways and for providing approval for aircraft movements on aprons where aircraft park at gates. The controller stated that only one aircraft of the size of a B737 or A320 would be approved to move at a time on the apron area near gates E1 and D2. In the 30 minutes before the collision, the surface movement controller had been very busy. Transmissions on the surface movement control frequency had been taking place for about 96 per cent of that time and the controller had been controlling many aircraft. The investigation is continuing and it is expected to be completed by February 2014. ________ The information contained in this web update is released in accordance with section 25 of the Transport Safety Investigation Act 2003 and is derived from the initial investigation of the occurrence. Readers are cautioned that new evidence will become available as the investigation progresses that will enhance the ATSB's understanding of the accident as outlined in this web update. As such, no analysis or findings are included in this update. Gates D2 and E1 Source: Apron diagram Melbourne Airport, occurrence details by ATSB 1. Clearance lines are red lines marked on the apron. They provide separation between parked and taxying aircraft on the apron. _____________________ Updated 13 August 2013 On 10 August 2013 at approximately 0930 Eastern Standard Time, a Boeing Company B737-8FE VH-YID with 6 crew and 168 passengers was being pushed back from gate E1 at Melbourne Airport terminal. An Airbus Industrie A320-232 VH-VGR with two flight crew was stationary on a taxi line, behind and to the left of the B737, waiting to dock at gate D2. During the pushback a collision occurred between the B737 and the A320 resulting in damage being occasioned to the left winglet of B737 and the tail cone of the A320. There were no reported injuries to persons on the aircraft or to ground staff. The investigation is continuing and will involve: • examination of the two aircraft • interviews with ground staff and flight crew of both aircraft • examination of the recorded information • examination of the operators’ procedures • review of the relevant radio and radar data. It is anticipated that the investigation will be completed by February 2014.
Findings
the ATSB's findings: contributing factors and other factors that increased risk, verbatimFindings From the evidence available, the following findings are made with respect to the collision during pushback between Boeing B737-8FE, registered VH-YID, and Airbus A320-232, registered VH-VGR, at Melbourne Airport, Victoria on 10 August 2013. These findings should not be read as apportioning blame or liability to any particular organisation or individual. Contributing factors • The dispatcher of the B737 could not visually confirm the position of the A320 relative to its assigned gate and incorrectly assessed that, as the aircraft was stationary, it was at the gate. • The pushback of the B737 was commenced with insufficient clearance from the A320, which was not identified prior to the collision as the dispatcher's position to the right-front of the B737 prevented observation of its left wing. › 10 ‹ ATSB – AO-2013-125
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.