FlarePath
ATSB AO-2009-011 · ATSB (Australia) · Occurrence Investigation

Airbus Industrie A330

Sydney Aerodrome, NSW · 2009-03-06·VH-QPJ

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
—
serious
No injury
highest injury
NONE
damage

What happened

ATSB summary, verbatim

Weight and balance event - Airbus A330-303, VH-QPJ, Sydney Aerodrome, New South Wales, 6 March 2009 (Loading related) Summary On 6 March 2009, an Airbus A330‑303 aircraft, registered VH-QPJ, was being loaded for dispatch on a scheduled international passenger service between Sydney, New South Wales and Hong Kong. Operational changes prior to the aircraft's dispatch required an adjustment of the planned load, with the load controller electing to offload a pallet of freight originally scheduled for that flight, and substituting it with a lighter pallet in the load management system. Following the pallet substitution in that system, the load controller did not amend the loading instructions that had been previously issued to the ramp staff loading the aircraft. That resulted in the ramp staff being unaware of the changed loading requirement and the loading proceeded as initially planned. The discrepancy between the actual aircraft load and operator's load management system was not detected during the completion of the load controller's 'Final Distribution Check' prior to issuing the final load sheet to the flight crew. That resulted in the aircraft exceeding the structural maximum taxi weight by 384 kg and the maximum structural take-off weight by about 884 kg. It also resulted in the flight crew entering inaccurate centre of gravity and zero fuel weight data into a number of the aircraft's systems. Due to a delay in the notification of the loading error to the operator's relevant departments, the aircraft operated another 10 sectors before maintenance inspections for an overweight taxi were completed. As a result of this occurrence, the operator implemented several changes to the process for managing load control activities. Those changes included: implementing a procedure to ensure the immediate notification of loading-related incidents and changes to the operating procedures in load control, including the introduction of a read and sign process for important ramp and load control communications; the appointment of a load control standards officer; and the conduct of a training needs analysis for load control officers.

Findings

the ATSB's findings: contributing factors and other factors that increased risk, verbatim
Findings From the evidence available, the following findings are made with respect to the weight and balance event that occurred at Sydney Aerodrome, New South Wales on 6 March 2009 and involved Airbus A330-303 aircraft, registered VH-QPJ. They should not be read as apportioning blame or liability to any particular organisation or individual. Contributing safety factors • The load controller selected the 'Approve Distribution' flight management function before the load distribution for the flight was finalised. The load controller had not finalised the load distribution for the flight when the Flight Management Event Scheduler automatically issued a Graphical Load Instruction Report that predicted that the aircraft would significantly exceed its maximum taxi and take-off weights. The load controller did not reissue the Graphical Instruction on finalisation of the aircraft’s load distribution. The controller did not a discrepancy between the Graphical Load Instruction Report and the loading information • • • - 6 - contained in the Flight Management system when completing the final distribution check. Other safety factors • The entry of incorrect weight and balance data into the aircraft’s systems adversely affected the accuracy of the data and/or functions provided by those systems and had the potential to affect the safety of flight. • A significant breakdown in the operator’s internal reporting procedures contributed to the delayed notification of the maximum taxi weight exceedance, and in the assessment of the need for any checks/inspections before further flight to assure the aircraft’s ongoing airworthiness. Other key findings • There had been no quality assurance review of the Regional Load Control centre in the 22 months preceding the incident.
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.