Boeing 747-433
After departure from London Heathrow Airport · 2024-02-08·G-ONEE
What happened
AAIB synopsis, verbatimThe flight involved a freighter variant of the Boeing 747-400 that was due to fly from London Heathrow Airport to Hong Kong International Airport. The aircraft suffered numerous electrical issues which began during the takeoff roll and worsened during the climb. These were caused by the loss of AC electrical buses 1 and 4, which resulted in multiple failure messages for the flight crew to manage as well as the loss of all pitot tube heating. The flight crew carried out numerous, concurrent checklists to deal with the system failures, declared a PAN and started to divert to Amsterdam Schiphol Airport. When a pressurisation issue caused the crew to initiate a descent, the aircraft entered icing conditions and the pitot tubes froze, resulting in all three airspeed indicators indicating an erroneously low airspeed. The autopilot remained engaged and pitched the aircraft nose-down to regain indicated airspeed. The pitch reached 7.6° nose-down with an associated 6,240 ft/min descent rate, before the aircraft exited icing conditions, correct airspeed was regained and the autopilot pitched up. The descent had resulted in an 18 kt overspeed. The flight crew declared a MAYDAY, dealt successfully with a flap issue and landed safely at Schiphol Airport. The loss of power to the two AC buses was the result of water ingress into Generator Control Units (GCUs) 1 and 4, located in the E1/E2 rack in the Main Equipment Centre beneath the cargo deck floor. The water led to the GCUs commanding contactors to open, which isolated AC Bus 1 and 4. Water had entered the main cargo deck prior to departure because the L1 door had been left open during rain. The investigation was unable to determine the exact path that water took from the cargo deck floor to the GCUs, but a number of weaknesses in the water ingress protection measures were found that could have caused or contributed to the water ingress. There have been previous events of water ingress into GCUs and other events of water contamination of the electrical/electronic units in the E1/E2 rack on the 747-400, which can lead to the loss of flight critical systems. This has led to Service Bulletins and Airworthiness Directives to introduce measures such as installing a fibreglass reinforcing overcoat on the drip shield above the E1/E2 rack, but there was no requirement for a repetitive inspection of the drip shield. There was also no maintenance requirement to repetitively inspect in detail the condition of the floor panel seals, waterproof tape, power drive units and L1 door floor mat in the area above and near the Main Equipment Centre. Therefore, the AAIB has made four safety recommendations to address these maintenance concerns.
Conclusion
the AAIB's conclusion, verbatimThe aircraft suffered numerous electrical system failures that were caused by a loss of AC Bus 4, followed shortly thereafter by a loss of AC Bus 1. The loss of power was the result of water ingress into GCUs 1 and 4 which led to the GCUs commanding contactors to open to isolate AC Bus 1 and 4. Water had entered the main cargo deck prior to departure because the L1 door had been left open during rain, and sealant was missing from the corner of the L1 door mat. The investigation was unable to determine the exact path that water took from the cargo deck floor to the GCUs, but a number of weaknesses in the water ingress protection measures were found that could have caused or contributed to water ingress into the GCUs. The system failures led to multiple EICAS messages and a highly complex situation, outside the scope of normal operations, creating a high workload for the flight crew. The crew managed these by using an effective TDODAR decision-making process supported by the presence of a third crew member. After the loss of the second AC bus, the crew appropriately declared a PAN and diverted to Schiphol Airport. There was no QRH procedure for the simultaneous loss of AC buses 1 and 4; however, the crew were aware that all pitot heating had been lost and that unreliable airspeed could occur in icing conditions. The rising cabin altitude led them to initiate a descent into icing conditions, and although they were aware of the ias disagree message, they decided to keep the autopilot engaged to reduce workload. This coincided with a temporary handover of flying control between the PF and PM for the crew to check correct routing in the FMC. They had a target pitch attitude of 0° in mind but allowed the autopilot to pitch the aircraft nose-down to -7.6° with an associated 6,240 ft/min descent rate. The crew were about to intervene when the autopilot began correcting the pitch as the aircraft exited icing conditions, and the correct IAS returned. The commander declared a MAYDAY, but the excessive descent rate led to an 18 kt overspeed. The flight crew were able to manage the subsequent flap issues and landed safely.
Safety recommendations
4 issuedwhat changed because of this accident- AAIB 2026-013issued
It is recommended that Boeing Commercial Airplanes introduce a maintenance requirement on the Boeing 747-400 freighter variants to repetitively inspect the condition of the drip shield over the E1 and E2 racks in the Main Equipment Centre, to reduce the likelihood of water ingress that could cause the loss of flight critical systems.
- AAIB 2026-014issued
It is recommended that Israel Aerospace Industries introduce a maintenance requirement on the Boeing 747-400 SF to repetitively inspect the condition of the drip shield over the E1 and E2 racks in the Main Equipment Centre, to reduce the likelihood of water ingress that could cause the loss of flight critical systems. The drip shield over the E1 and E2 racks is the final barrier to water ingress into the top of electrical and electronic equipment located on the top row of the racks. Above the drip shield lies the main deck floor which is designed to be a wet area, and which should prevent water from reaching the drip shield. This first line of defence relies on the condition of the sealant between the floor panels, polyurethane tape over this sealant, in addition to wide moisture barrier tape over the entire deck area, combined with effective drainage. In the case of G-ONEE some of the tape on the floor above and near the MEC was in poor condition, and the sealant was missing from the corner of the dam around the L1 door mat. The only maintenance requirement for this area was to perform a general zonal inspection of the entire cargo deck area at each A-check (every 1,000 flight hours), with no focus on the
- AAIB 2026-015issued
It is recommended that Boeing Commercial Airplanes introduce a maintenance requirement on the Boeing 747-400 freighter variants to repetitively inspect in detail the condition of the floor panel seals, waterproof tape, power drive units and L1 door floor mat in the area above and near the Main Equipment Centre, to reduce the likelihood of water ingress that could cause the loss of flight critical systems.
- AAIB 2026-016issued
It is recommended that Israel Aerospace Industries introduce a maintenance requirement on the Boeing 747-400 SF to repetitively inspect in detail the condition of the floor panel seals, waterproof tape, power drive units and L1 door floor mat in the area above and near the Main Equipment Centre, to reduce the likelihood of water ingress that could cause the loss of flight critical systems. Conclusion The aircraft suffered numerous electrical system failures that were caused by a loss of AC Bus 4, followed shortly thereafter by a loss of AC Bus 1. The loss of power was the result of water ingress into GCUs 1 and 4 which led to the GCUs commanding contactors to open to isolate AC Bus 1 and 4. Water had entered the main cargo deck prior to departure because the L1 door had been left open during rain, and sealant was missing from the corner of the L1 door mat. The investigation was unable to determine the exact path that water took from the cargo deck floor to the GCUs, but a number of weaknesses in the water ingress protection measures were found that could have caused or contributed to water ingress into the GCUs. The system failures led to multiple EICAS messages and a highly complex situation, outside
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.