de Havilland Aircraft of Canada Limited DHC-8
Runway 27, Guernsey Airport · 2024-04-23·9H-LWB
What happened
AAIB synopsis, verbatimOn a flight returning to Guernsey from London Gatwick the Commander tried to execute a gentle touchdown, the aircraft floated and touched down about two-thirds down the runway length, it then overran the end of the runway at slow speed. There were no injuries to the passengers or crew and the aircraft was undamaged. The flight was being operated under a Wet Lease agreement and following the Serious Incident both the Lessee and the Lessor made changes to their safety management systems. Two safety actions were implemented after the event; one to enhance the Lessee’s initial understanding of how flights under Wet Lease contracts were being operated, and the other was the implementation by the Channel Islands Director of Civil Aviation of an Augmented Review of Foreign Carrier Permit (FCP) Applications for Wet Lease operations in the Channel Islands. One Safety Recommendation resulted from the investigation regarding the location of emergency checklists in the DHC-8 Quick Reference Handbook.
Conclusion
the AAIB's conclusion, verbatimThe runway excursion occurred because the Commander, while trying to perform a gentle landing, touched down a considerable distance beyond the landing zone with insufficient runway left to arrest the aircraft using normal braking. The application of full braking force was too late to prevent a low-speed departure from the runway. More proactive exploitation of FDM data may have detected how the flights were being conducted in the early stages of the contract as there was evidence available of previous landings beyond the touchdown zone. In response to the serious incident both the Lessee and the Lessor identified and made changes to their safety management systems.
Safety recommendations
1 issuedwhat changed because of this accident- AAIB 2026-006issued
It is recommended that De Havilland Aircraft of Canada Limited reviews the location and indexing of the ‘on ground non-normal’ and ‘evacuation’ checklists in the DHC-8 Quick Reference Handbook and makes appropriate changes to improve their ease of access during an emergency. Organisational factors An imperative to generate capacity through ACMI contracts was due to a lack of aircraft availability primarily caused by unforeseen problems in the transition from a mixed aircraft fleet to a predominately ATR fleet. This particular ACMI contract was required at short notice after a long-planned alternative fell through unexpectedly. The short notice nature of the ACMI meant that the change management process for both the Lessee and Lessor, whilst compliant, was time pressured. But there was no evidence that required safety activities or due diligence were compromised prior to the letting of the contract. Once the contract was established the relationship between the parties appears to have been positive although reactive in nature. For example, agreements on the provision of FDM data were in place but no information containing any safety triggers had been provided to the Lessee by the Lessor prior to the serious incident.
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.