What happened

AAIB synopsis, verbatim

Summary: Whilst performing a demonstration flight, the remote pilot lost control of the 95 kg Alauda Airspeeder Mk II scale demonstrator. After the loss of control had been confirmed by the remote pilot, the safety ‘kill switch’ was operated but had no effect. The Unmanned Aircraft then climbed to approximately 8,000 ft, entering controlled airspace at a holding point for flights arriving at Gatwick Airport, before its battery depleted and it fell to the ground. It crashed in a field of crops approximately 40 m from occupied houses and 700 m outside of its designated operating area. There were no injuries. The AAIB found that the Alauda Airspeeder Mk II was not designed, built or tested to any recognisable standards and that its design and build quality were of a poor standard. The operator’s Operating Safety Case contained several statements that were shown to be untrue. The Civil Aviation Authority’s Unmanned Aircraft Systems (UAS) Unit had assessed the operator’s application and, after clarification and amendment of some aspects, issued an exemption to the Air Navigation Order to allow flights in accordance with the operator’s Operating Safety Case. The Civil Aviation Authority did not meet the operator or inspect the Alauda Airspeeder Mk II before the accident flight. There have been many other similar events where control of an unmanned aircraft has been lost, resulting in either it falling to the ground or flying away. Even a small unmanned aircraft falling from a few metres could cause a fatal injury if it struck a person. The Civil Aviation Authority and the organisation which designed and operated the Airspeeder Mk II have introduced measures to address a number of issues identified during the course of the investigation. In addition to the actions already taken this investigation report makes 15 Safety Recommendations regarding the operator’s procedures, airworthiness standards and the regulatory oversight. The AAIB has published its final report on the accident involving an Alauda Airspeeder Mk II UAS

Conclusion

the AAIB's conclusion, verbatim
After the Airspeeder Mk II failed to respond to control inputs it entered an uncontrolled climb at maximum power. Operation of an independent kill switch had no effect and the aircraft continued to climb for 4½ minutes, drifting with the wind and reaching a height of approximately 8,000 ft. The aircraft infringed controlled airspace over a radio navigation beacon used as a holding point for Gatwick Airport. After depletion of the batteries, the aircraft fell to the ground in a field, 40 m from occupied houses and 875 m from its launch point. The operation of the Airspeeder Mk II during the accident flight breached conditions of the exemption granted by the CAA for the flight. The loss of control was caused by a loss of link between the ground and airborne control systems. The exact reason for this could not be established but considered likely to be either RF interference or a failure of the onboard control system. The investigation identified a wide range of contributory factors that set the conditions for this occurrence and made an accident more likely. The Alauda Airspeeder Mk II was not designed, built or tested to any recognisable standards and although the operator’s OSC, submitted to the CAA claimed it had been built to ‘the highest standards’, none were referenced. A number of issues were identified with the design and build of the Airspeeder Mk II, including numerous single point failures. The assembly of the electronic flight control system failed to meet relevant standards. The flight control system was not capable of providing telemetry to the remote pilot and was not fitted with a GNSS position monitoring system which could have enabled electronic safety measures, such as automatic return to takeoff point or geo-fencing, to be used. There was no placarding to warn fi rst responders of the hazards of the high voltage stored energy device (battery). The Airspeeder Mk II did not have any data recording devices fitted, which would have provided useful information about the conduct of the flight. The electronic kill switch was manually operated. In the event of a loss of control the remote pilot would have to recognise that the UA was no longer responding to control inputs then communicate with the observer who would then activate the kill switch. The time delay in recognising a loss of control and operating the kill switch could result in the UA descending uncontrollably outside of the specified operating area.

Safety recommendations

16 issuedwhat changed because of this accident
  • AAIB 2020-017issued

    It is recommended that the Civil Aviation Authority require that operators issued with a Permissions for Commercial Operations (PfCO) include in their operations manuals the need to practise routinely the actions to take in the event of emergencies, and specify how pilots will remain competent at maintaining manual control of their aircraft in the event that automated flight modes are lost.

  • AAIB 2021-001issued

    It is recommended that Riotplan Proprietary Limited, trading as Alauda Racing, amends its processes to ensure that it designs, builds and tests unmanned and manned aircraft in accordance with appropriate standards to ensure the safety of those who may be affected by their operation. CAP 722 The regulations published by the European Commission on 11 June 2019 related to the harmonised use of UAS within Europe. These were implemented by the UK Government, with the CAA providing policy and guidance by updating CAP 722 to Edition 8 on

  • AAIB 2021-002issued

    It is recommended that the Civil Aviation Authority update Civil Aviation Publication 722, Unmanned Aircraft System Operations in UK Airspace – Guidance & Policy, to require detailed evaluation of any Unmanned Aircraft Systems that use onboard systems to mitigate risks with Risk Severity Classifications of ‘Major’, ‘Hazardous’ or ‘Catastrophic’. Radio frequency interference The operator indicated that they had never had radio link problems with this aircraft. They stated that the ‘signal strength test’ had been successfully completed the day before the accident flight but this did not involve using the kill switch or any supplementary electronic equipment such as a spectrum analyser. CAP 722 did not require the use of a spectrum analyser, only referring to its use if an aircraft is used in an urban environment. The kill switch frequency and communication protocol were different to that of the flight controller. This was confirmed as being operational prior to the flight but, given that no radio survey was performed with the kill switch, its operation in the display area could not be confirmed. As the flight progressed, with no two-way communication with the kill switch, its operation could not be assured until it was activated.

  • AAIB 2021-003issued

    It is recommended that the Civil Aviation Authority update Civil Aviation Publication 722, Unmanned Aircraft System Operations in UK Airspace – Guidance & Policy, to provide guidance on the planning, completion and documenting of Radio Frequency surveys to reduce the risk of Radio Frequency interference or signal loss when operating Unmanned Aircraft Systems. Additionally, the UAS Sector Team have requested that the next version of CAP 722 include a requirement for the applicant to prove and provide evidence of a secure RF. If an RF survey has been stated as a mitigating factor to reduce the risk of a “poor signal” related failure, or to support the use of an RF-enabled safety system, then proof of example surveys will be requested as part of the approval process. On a case-by-case basis, the UAS Sector Team will also request these documents before issuing an approval. As this action has not been confirmed or completed, in order to ensure that safety systems fitted to a UAS which rely on a radio link for their operation will not be subject to Radio Frequency interference and/or loss of signal, the following Safety Recommendation is made:

  • AAIB 2021-004issued

    It is recommended that the Civil Aviation Authority require Unmanned Aircraft System operators, that use unmanned aircraft which rely on a radio link to operate safety systems, to provide Radio Frequency survey reports to the Civil Aviation Authority for review, to ensure they are suitable and sufficient. Display area With the aircraft maintaining the speed limits within the CAA’s exemption, completion of the ‘loss of link’ procedure would have to have been rapid in order to ensure the aircraft was brought down within areas designated in the OSC. If the aircraft was at the eastern edge of the display area, travelling at 11 m/s and 20 m agl, when kill switch activation was required, a reaction time of 2.1 seconds or less would be needed to maintain the aircraft in

  • AAIB 2021-005issued

    It is recommended that the Civil Aviation Authority update Civil Aviation Publication 722, Unmanned Aircraft System Operations in UK Airspace – Guidance & Policy, with guidance on how to define an Unmanned Aircraft System’s operational and safety areas, using up-to-date maps, accurate trajectory analysis and human or automated safety system reaction times, to ensure a safe operation. Safety systems A number of modern commercially available UAS are fitted with GNSS position monitoring systems as standard which can aid navigation but also enable electronic safety measures. These include geo-fencing, automated return to the takeoff point, controlled descents, hovering and automatic landing. Other safety systems are also available including automatic parachute recovery systems which, on detecting a problem, shut off the UA’s power supply and deploy a recovery parachute. This UA contained no such systems, relying only on a simple kill switch to cut power and allow the aircraft to descend to the ground uncontrollably in the event of emergency. The use of any of these safety systems on the UA could have significantly reduced the risk to other aircraft and the public. Given that the CAA will receive other applications

  • AAIB 2021-006issued

    It is recommended that the Civil Aviation Authority update Civil Aviation Publication 722, Unmanned Aircraft System Operations in UK Airspace – Guidance & Policy, to provide examples of Unmanned Aircraft System safety systems. S afety Recommendation 2021-007 It is recommended that the Civil Aviation Authority introduce requirements to define a minimum standard for safety systems to be installed in Unmanned Aircraft Systems operating under an Operational Authorisation, to ensure adequate mitigation in the event of a malfunction. Demonstrating compliance with the exemption This investigation identified a number of non-compliances by the operator to the CAA’s exemption, Appendix A. Those relating to the geographical and speed limitations had to be calculated after the accident using photogrammetry from on-board video. The aircraft was not fitted with a data recording system. Such systems provide significant benefits during the design and development of a UAS as well as to accident and incident investigation. In addition, recorded data could be used to demonstrate the maturity and suitability of the UAS for the operation and compliance with the conditions of an Operational Authorisation. Therefore, the following Safety Recommendation is made:

  • AAIB 2021-007issued

    It is recommended that the Civil Aviation Authority introduce requirements to define a minimum standard for safety systems to be installed in Unmanned Aircraft Systems operating under an Operational Authorisation, to ensure adequate mitigation in the event of a malfunction.

  • AAIB 2021-008issued

    It is recommended that the Civil Aviation Authority require Unmanned Aircraft System operations under an Operational Authorisation to be fitted with a data recording system which is capable of demonstrating: compliance with the Authorisation’s conditions, safe operation and the logging of any failures which may affect the safe operation of the Unmanned Aircraft System. High-voltage stored energy devices The first responders to this accident were presented with the wreckage of a large UAS which had no external markings other than the sponsor’s names. The damaged main battery was hazardous but there were no warnings of the risks of explosion or electric shock. There was also no battery self-monitoring system for temperature or voltage. As Footnote

  • AAIB 2021-009issued

    It is recommended that the Civil Aviation Authority specify the minimum requirements for the monitoring of Unmanned Aircraft System high-voltage stored energy devices, to ensure safety of operation.

  • AAIB 2021-010issued

    It is recommended that the Civil Aviation Authority specify the minimum requirements for readily identifiable warnings and safety information on Unmanned Aircraft high-voltage stored energy devices to inform 3rd parties of the potential hazard. Organisational observations The operator defined three accountable personnel in their OSCs: the CEO, Chief Pilot and Maintenance Controller. The CEO was ultimately responsible for all operations conducted by the operator but some of these responsibilities had been delegated to other company personnel. The remote pilot was the operator’s Chief Remote Pilot and their only pilot that was authorised to operate the aircraft. As stated in the OSC, he was responsible for all operational matters affecting the safety of operations, including ensuring that operations were conducted in compliance with the CAA and hence the limitations laid down in the exemption. This made him ultimately responsible for the conduct of the flight and ensuring that the limits of the exemption, as well as those in the OSC, were complied with. However, several limits stated in the exemption and the OSC were not complied with. He was also responsible for developing checklists and procedures relating to fl ight operations.

  • AAIB 2021-011issued

    I t is recommended that the Civil Aviation Authority ensure that operators of Unmanned Aircraft Systems have an effective Safety Management System in place prior to issuing an Operational Authorisation. The operator stated that, as a result of the accident, they have carried out a comprehensive review of their operation and, as a result, have introduced a Safety Management System in line with the guidance material published by CASA. Operator’s OSC The extant CAP 722 contained references encouraging organisations to understand certification requirements and that aircraft of a higher mass would be expected to refer to requirements of aircraft in a higher category. The absence of this information in the OSC’s should have alerted the CAA to the limited aviation experience of the operator. The OSC was prepared for the sole purpose of the demonstration flights at Goodwood in July 2019. However, it contained inaccuracies; for example, Volume 1 stated that any accidents or incidents should be notified to the ATSB rather than the AAIB, as the UK’s safety investigative authority. The OSCs did not reference any certification or industry standards that the aircraft was designed and built to. The section in the OSC requiring ‘Details of design and manufacturing

  • AAIB 2021-012issued

    It is recommended that the Civil Aviation Authority, before issuing an Operational Authorisation to operate an Unmanned Aircraft System they have not previously had experience with, carry out a physical examination of the Unmanned Aircraft System to ensure that it is designed and built to suitable standards, and observe a test flight to confirm operation in accordance with the Operating Safety Case. Compliance with exemption The exemption listed a number of specific limitations, along with the requirement to operate in accordance with OSC Volume 1. During the flight display, the aircraft was operated within

  • AAIB 2021-013issued

    It is recommended that the Civil Aviation Authority update Civil Aviation Publication 722, Unmanned Aircraft System Operations in UK Airspace – Guidance & Policy, to include reference to the consequences of not complying with the conditions of an Operational Authorisation to operate an Unmanned Aircraft System. CAA on-site The CAA attended the event with the expectation that they would be able to meet the operator for the first time and inspect the aircraft prior to the demonstration flight. However, the exemption was not conditional on this inspection nor did the CAA have any specific inspection criteria or any specific issues they wanted to raise with the operator. The airfield NOTAM was time limited and the CAA were advised that they would not be able to view the aircraft prior to the demonstration flight. Upon arrival, they were directed to the hospitality area, which they agreed to, to prevent interrupting the operators who were concentrating on their pre-flight checklists. Had a structured inspection of the UAS, prior to fl ight, been carried out it could have easily identified that the UA did not meet the requirements of the exemption to the ANO. Monitoring of the operator’s preparations for the fl ight would

  • AAIB 2021-014issued

    It is recommended that the Civil Aviation Authority adopt appropriate design, production, maintenance and reliability standards for all Unmanned Aircraft Systems with aircraft capable of imparting over 80 joules of energy. Footnote

  • AAIB 2021-015issued

    It is recommended that the European Union Aviation Safety Agency adopt appropriate design, production, maintenance and reliability standards for all Unmanned Aircraft Systems with aircraft capable of imparting over 80 joules of energy. Conclusions After the Airspeeder Mk II failed to respond to control inputs it entered an uncontrolled climb at maximum power. Operation of an independent kill switch had no effect and the aircraft continued to climb for 4½ minutes, drifting with the wind and reaching a height of approximately 8,000 ft. The aircraft infringed controlled airspace over a radio navigation beacon used as a holding point for Gatwick Airport. After depletion of the batteries, the aircraft fell to the ground in a field, 40 m from occupied houses and 875 m from its launch point. The operation of the Airspeeder Mk II during the accident flight breached conditions of the exemption granted by the CAA for the flight. The loss of control was caused by a loss of link between the ground and airborne control systems. The exact reason for this could not be established but considered likely to be either RF interference or a failure of the onboard control system. The investigation identified a wide range of contributory factors that set the conditions for

In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.