What happened
AAIB synopsis, verbatimIntroduction: The Air Accidents Investigation Branch (AAIB) became aware of this accident during the evening of 27 October 2018. In exercise of his powers, the Chief Inspector of Air Accidents ordered an investigation to be carried out in accordance with the provisions of Regulation (EU) 996/2010 and the UK Civil Aviation (Investigation of Air Accidents and Incidents) Regulations 2018. The sole objective of the investigation of an accident or incident under these regulations is the prevention of future accidents and incidents. It shall not be the purpose of such an investigation to apportion blame or liability. In accordance with established international arrangements, the Agenzia Nazionale per la Sicurezza del Volo (ANSV) of Italy, representing the State of Design and Manufacture of the helicopter, appointed an Accredited Representative (Accrep) to participate in the investigation. The Transportation Safety Board (TSB) of Canada, representing the State of Design and Manufacture for the helicopter’s engines, the National Transportation Safety Board (NTSB) of the USA, representing the State of Design and Manufacture of the tail rotor actuator and the Bureau d’Enquêtes et d’Analyses pour la sécurité de l’aviation civile (BEA) of France representing the State of Design and Manufacture of the tail rotor duplex bearing, also appointed Accreps. Experts were appointed by the Aircraft Accident Investigation Committee of Thailand and the State Commission on Aircraft Accidents Investigation of Poland. The helicopter, bearing, tail rotor actuator and grease manufacturers, the operator, the European Union Aviation Safety Agency (EASA), and the UK Civil Aviation Authority (CAA) also assisted the AAIB investigation. Summary: At 1937 hrs the helicopter, carrying the pilot and four passengers, lifted off from the centre spot of the pitch at the King Power Stadium. The helicopter moved forward and then began to climb out of the stadium on a rearward flightpath while maintaining a northerly heading and with an average rate of climb of between 600 and 700 ft/min. Passing through a height of approximately 250 ft, the pilot began the transition to forward flight by pitching the helicopter nosedown and the landing gear was retracted. The helicopter was briefly established in a right turn before an increasing right yaw rapidly developed, despite the immediate application of corrective control inputs from the pilot. The helicopter reached a radio altimeter height of approximately 430 ft before descending with a high rotation rate. At approximately 75 ft from the ground the collective was fully raised to cushion the touchdown. The helicopter struck the ground on a stepped concrete surface, coming to rest on its left side. The impact, which likely exceeded the helicopter’s design requirements, damaged the lower fuselage and the helicopter’s fuel tanks which resulted in a significant fuel leak. The fuel ignited shortly after the helicopter came to rest and an intense post-impact fire rapidly engulfed the fuselage. The investigation found the following causal factors for this accident: Seizure of the tail rotor duplex bearing initiated a sequence of failures in the tail rotor pitch control mechanism which culminated in the unrecoverable loss of control of the tail rotor blade pitch angle and the blades moving to their physical limit of travel. The unopposed main rotor torque couple and negative tail rotor blade pitch angle resulted in an increasing rate of rotation of the helicopter in yaw, which induced pitch and roll deviations and made effective control of the helicopter’s flightpath impossible. The tail rotor duplex bearing likely experienced a combination of dynamic axial and bending moment loads which generated internal contact pressures sufficient to result in lubrication breakdown and the balls sliding across the race surface. This caused premature, surface initiated rolling contact fatigue damage to accumulate until the bearing seized. The investigation found the following contributory factors for this accident: The load survey flight test results were not shared by the helicopter manufacturer with the bearing manufacturer in order to validate the original analysis of the theoretical load spectrum and assess the continued suitability of the bearing for this application, nor were they required to be by the regulatory requirements and guidance. There were no design or test requirements in Certification Specification 29 which explicitly addressed rolling contact fatigue in bearings identified as critical parts; while the certification testing of the duplex bearing met the airworthiness authority’s acceptable means of compliance, it was not sufficiently representative of operational demands to identify the failure mode. The manufacturer of the helicopter did not implement a routine inspection requirement for critical part bearings removed from service to review their condition against original design and certification assumptions, nor were they required to by the regulatory requirements and guidance. Although the failure of the duplex bearing was classified as catastrophic in the certification failure analysis, the various failure sequences and possible risk reduction and mitigation measures within the wider tail rotor control system were not fully considered in the certification process; the regulatory guidance stated that this was not required. AAIB Special Bulletin S1/2018 , published on 14 November 2018 and AAIB Special Bulletin S2/2018 , published on 6 December 2018, provided initial information on the circumstances of this accident. During the course of this investigation and as a result of the findings made, the helicopter manufacturer has issued sixteen Service Bulletins and EASA has published nine Airworthiness Directives for the continued airworthiness of the AW169 and AW189 helicopter types. Eight Safety Recommendations have been made in this report. These have been made to EASA to address weaknesses or omissions identified in the regulations for the certification of large helicopters - Certification Specification 29. The recommendations address the main findings of the investigation and include: validation of design data by suppliers post‑test; premature rolling contact fatigue in bearings; life limits, load spectrum safety margin and inspection programmes for critical parts; and assessment and mitigation of catastrophic failure modes in systems. Animation This animation is intended to help visualise and explain the effect of the bearing failure. The graphics are not a precise depiction of the aircraft’s behaviour or mechanical components. Comprehensive information about the circumstances of the accident and the reasons for the severity of the outcome are contained in the investigation final report. G-VSKP Animation
Conclusion
the AAIB's conclusion, verbatimCausal factors 1. Seizure of the tail rotor duplex bearing initiated a sequence of failures in the tail rotor pitch control mechanism which culminated in the unrecoverable loss of control of the tail rotor blade pitch angle and the blades moving to their physical limit of travel. 2. The unopposed main rotor torque couple and negative tail rotor blade pitch angle resulted in an increasing rate of rotation of the helicopter in yaw, which induced pitch and roll deviations and made effective control of the helicopter’s flightpath impossible. 3. The tail rotor duplex bearing likely experienced a combination of dynamic axial and bending moment loads which generated internal contact pressures sufficient to result in lubrication breakdown and the balls sliding across the race surface. This caused premature, surface initiated rolling contact fatigue damage to accumulate until the bearing seized. 3.3 Contributory factors 1. The load survey flight test results were not shared by the helicopter manufacturer with the bearing manufacturer in order to validate the original analysis of the theoretical load spectrum and assess the continued suitability of the bearing for this application, nor were they required to be by the regulatory requirements and guidance. 2. There were no design or test requirements in Certification Specification 29 which explicitly addressed rolling contact fatigue in bearings identified as critical parts; while the certification testing of the duplex bearing met the airworthiness authority’s Acceptable Means of Compliance, it was not sufficiently representative of operational demands to identify the failure mode. 3. The manufacturer of the helicopter did not implement a routine inspection requirement for critical part bearings removed from service to review their condition against original design and certification assumptions, nor were they required to by the regulatory requirements and guidance. 4. Although the failure of the duplex bearing was classified as catastrophic in the certification failure analysis, the various failure sequences and possible risk reduction and mitigation measures within the wider tail rotor control system were not fully considered in the certification process; the regulatory guidance stated that this was not required. Recommendations
Safety recommendations
8 issuedwhat changed because of this accident- AAIB 2023-018issued
It is recommended that the European Union Aviation Safety Agency amend Certification Specification 29.602 to require type design manufacturers to provide the results of all relevant system and flight testing to any supplier who retains the sole expertise to assess the performance and reliability of components identified as critical parts within a specific system application, to verify that such components can safely meet the in-service operational demands, prior to the certification of the overall system. Rolling Contact Fatigue There are currently no explicit requirements within the CS 29 regulations defining how rolling contact fatigue should be addressed within the design process or any compliance test activity for any type of bearing, even though bearings are being used in critical safety applications on helicopters. Following the LN-OJF accident and the subsequent Norwegian Safety Investigation Authority findings and recommendations, the European Union airworthiness authority undertook to review RCF as part of RMT 128 and an NPA was issued in February 2022, with various proposed amendments to CS 29, which were eventually included in Amendment 11 of CS 29 in February 2023. The amendment to the AMC for CS 29.571 offers an improvement by providing
- AAIB 2023-019issued
It is recommended that the European Union Aviation Safety Agency introduce additional requirements to Certification Specification 29 to specifically address premature rolling contact fatigue failure across the full operating spectrum and service life of bearings used in safety critical applications.
- AAIB 2023-020issued
It is recommended that the European Union Aviation Safety Agency amend Certification Specification 29.602 to define the airworthiness status of life limits on non-structural critical parts and how they should be controlled in service.
- AAIB 2023-021issued
It is recommended that the European Union Aviation Safety Agency define the airworthiness status of life limits and how they should be controlled for existing non-structural critical parts approved to Certification Specification 29.602 requirements, already in service. The classification of the tail rotor duplex bearing as a critical part by the helicopter manufacturer meant that additional control measures were introduced during manufacture and installation of the bearing and required that duplicate and recorded inspections be carried out during maintenance. However, prior to the accident, there was no requirement in place, either regulatory or from the manufacturer, to conduct a sample assessment of the bearing condition after removal from service for any of the AW139, AW189 or AW169 fleets. This could have helped to validate the assumptions used for the calculated L10 life and discard time calculations by flagging up potential premature degradation issues. Time expired and rejected bearings were instead disposed of directly by operators, resulting in valuable evidence being lost. This issue of inspecting critical parts following rejection from service is an ongoing concern that has been identified in several previous accident investigations, including the investigation
- AAIB 2023-022issued
It is recommended that the European Union Aviation Safety Agency amend Certification Specification 29.602 to require manufacturers to implement a comprehensive post-removal from service assessment programme for critical parts. The findings from this should be used to ensure that reliability and life assumptions in the certification risk analysis for the critical part or the system in which it operates remain valid.
- AAIB 2023-023issued
It is recommended that the European Union Aviation Safety Agency require manufacturers to retrospectively implement a comprehensive post-removal from service assessment programme for critical parts, approved to Certification Specification 29.602 requirements, already in service. The findings from this should be used to ensure that the reliability and life assumptions in the certification risk analysis for the critical part or the system in which it operates remain valid. Starting with a theoretical load spectrum, calculation of a bearing L10 life10F10 to define a service discard time, is a statistical process, based on best practice developed from industry experience. It cannot be accurately or repeatably demonstrated by a single test due to the variability of individual results. This
- AAIB 2023-024issued
It is recommended that the European Union Aviation Safety Agency amend Certification Specification 29.602 to provide guidance and set minimum standards for the calculation of design load spectrums for non-structural critical parts. They must encompass, with an appropriate and defined safety margin, the highest individual operating load and combination of dynamic operating loads, and the longest duration of exposure to such loads that can be experienced in operation. System safety analysis The certification process for the tail rotor system conducted by the helicopter manufacturer identified that the consequences of failure of the duplex bearing would be potentially catastrophic, but it did not correctly identify the mechanism by which this would eventually occur. Compliance with the various certification requirements during development did offer opportunities to identify and mitigate the failure sequence seen in the accident, but these opportunities were not realised at the time. The failure mitigation recommended by the bearing manufacturer and employed by the helicopter manufacturer to prevent in-service failure of the duplex bearing, was a repetitive 400 hour subjective inspection for wear and smooth
- AAIB 2023-025issued
It is recommended that the European Union Aviation Safety Agency amend the relevant requirements of Certification Specification 29 and their Acceptable Means of Compliance to emphasise that, where potentially catastrophic failure modes are identified, rather than rely solely on statistical analysis to address the risk, the wider system should also be reviewed for practical mitigation options, such as early warning systems and failure tolerant design, in order to mitigate the severity of the outcome as well as the likelihood of occurrence.