FlarePath
UK AAIB AAIB-2018-GJMCR · UK AAIB · Field investigation

Boeing 737-4Q8

En-route to East Midlands Airport · 2018-10-12·G-JMCR

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
NONE
damage

What happened

AAIB synopsis, verbatim

Summary: The aircraft was operating a night flight to East Midlands Airport, with the left engine generator disconnected, and had just commenced its descent when the crew faced an unusual array of electrical failures on the flight deck. Despite the loss and degradation of a number of systems, the aircraft landed safely at East Midlands. The electrical failures were caused by the right engine Generator Control Unit (GCU) which had been incorrectly secured in its mounting tray and had disconnected in flight. The investigation also uncovered a number of contributory factors including: the management of defects and Acceptable Deferred Defects (ADD), recording of maintenance, and a number of weaknesses in the operator’s Safety Management System with regards to managing risk. Five Safety Recommendations are made to the operator regarding its safety management system and one to the Civil Aviation Authority. Bulletin Correction A correct was issued regarding this report on 10 October 2019. The amended report can be downloaded below.

Conclusion

the AAIB's conclusion, verbatim
This serious incident was caused by the incorrect racking of GCU 2 which moved forward in flight initially causing an intermittent and then total disconnection of the electrical connector. The aircraft was not designed to operate with the GCU disconnected and the crew were presented with an unusual situation that was not covered in the QRH. The activities surrounding the management of the faults on G-JMCR during the previous 12 days, and the actions of the crew in handling the emergency, indicates a weakness in the operator’s policies and procedures for the management of risk. Engineers were not always given sufficient time to investigate the faults, with the result that fault finding was often repeated and not finished. Work at a number of locations was not recorded as having been carried out in the aircraft documentation. The aircraft was dispatched from its main operation base with an ADD and flew through a number of locations where it could have been cleared, which was contrary to the procedures in the Operation Manual. Communication between LMC, the commander and the Part 145 organisation at Amsterdam was ineffective in highlighting the underling technical problems on the aircraft. The engineer was unaware of the full history of the faults and the concerns that LMC conveyed to the commander that there was a “serious electrical fault on the aircraft”. The engineer was tasked with resetting the generators and spent less than 30 minutes at the

Safety recommendations

6 issuedwhat changed because of this accident
  • AAIB 2019-004issued

    It is recommended that West Atlantic UK revises its policy and procedures for approving and clearing Minimum Equipment List entries and Rectification Interval Extensions to ensure that it conforms with the guidance contained within the European Union Aviation Safety Agency Acceptable Means of Compliance. Management of defects The operator recognised that the management of defects and rectification across their fleet was challenging due to the nature of their operations. The aircraft were rarely in the same place on consecutive days and there were frequently changes to the flying programme, which made the provision of spares, specialist engineers and equipment difficult. The operator’s staff were also conscious of the tight turnaround times that their customers expected and whilst there was no evidence of external pressure having been applied to any individuals, there may have been an element of self pressure to ensure that aircraft were not delayed. Fault finding was frequently stopped part way through and on three separate occasions the GCU were swapped without the aircraft documentation having been completed in accordance with Commission Regulation (EU) No 1321/2014, (continuing airworthiness).

  • AAIB 2019-005issued

    It is recommended that West Atlantic UK ensures that all work undertaken on its aircraft is documented in accordance with the requirements of Regulation (EU) No 1321/2014 (regarding continuing airworthiness). The management of defects was primarily carried out by staff in the LMC. These individuals may be required to manage a number of issues on separate aircraft during their shift. Their main aim is to ensure that the company meets its operational commitments during their period of duty. The main oversight was undertaken during the 0600 hrs morning conference which involved representatives from LMC and the Part M organisation using the updates provided on the operator’s messaging system. Despite numerous entries on FSR highlighting concerns with the electrical system on G-JMCR, and the difficulty in completing the fault finding during the tight turnaround times, there was no evidence of a plan to ensure that the aircraft was given sufficient downtime to rectify the faults and clear the ADD. Instead, the issue drifted on with an RIE approval and a number of engineers at different locations repeating similar fault-finding tasks until eventually the GCU was incorrectly secured and disconnected in flight.

  • AAIB 2019-006issued

    It is recommended that West Atlantic UK revises its policy and procedures to ensure effective management of defects, and the undertaking of dynamic risk assessments of the airworthiness of aircraft during all hours of operation. Communicating with other Part 145 organisations The electrical fault that occurred during the landing at Amsterdam was unusual. Lights and screens that can only be on or off were flashing which indicated that there was an intermittent fault within the No 2 electrical system that eventually caused the circuit breaker for GCU 2 to trip. The Part 145 engineers did not have access to the operators FSR and would not have known the history of the electrical problems on the aircraft, which LMC described to the commander as serious. While the commander gave a detailed explanation to LMC as to the problems he had experienced, this was not relayed to the engineer who was tasked with rectifying the problem with Gen 2 and resetting the system so that the aircraft could return to East Midlands. No written tasking document, recent history of the aircraft or the concerns from LMC that there was a serious electrical problem on the aircraft were provided to the engineer. The engineer reset the system as

  • AAIB 2019-007issued

    It is recommended that West Atlantic UK revises its policy and procedures for the tasking of maintenance activities by Line Maintenance Control and the sharing of relevant aircraft technical history to ensure that maintenance organisations undertaking work have access to all appropriate information. Safety management system This investigation identified safety issues across a number of areas that had not been identified or addressed by the Operator’s SMS. Therefore, the following Safety Recommendations are made:

  • AAIB 2019-008issued

    . It is recommended that West Atlantic UK revises its Safety Management System to meet the requirements of the scale and nature of their operation.

  • AAIB 2019-009issued

    It is recommended that the Civil Aviation Authority assess West Atlantic UK’s Safety Management System to ensure it meets the requirements of the scale and nature of their operation. Conclusion This serious incident was caused by the incorrect racking of GCU 2 which moved forward in flight initially causing an intermittent and then total disconnection of the electrical connector. The aircraft was not designed to operate with the GCU disconnected and the crew were presented with an unusual situation that was not covered in the QRH. The activities surrounding the management of the faults on G-JMCR during the previous

In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.