Jetstream 3102 31
Doncaster Sheffield Airport, Yorkshire · 2014-08-15·G-GAVA
What happened
AAIB synopsis, verbatimSummary: The aircraft’s left main landing gear failed shortly after it landed on Runway 20 at Doncaster Sheffield Airport. The left main landing gear detached from its mounts and the aircraft slid along the runway on its remaining landing gear, left wingtip and baggage pannier, before veering off the runway and coming to rest on the adjacent grass. The single passenger and the flight crew vacated the aircraft without injury. The failure occurred as a result of stress corrosion cracking in the forward pintle housing, at the top of the left landing gear cylinder. The same aircraft, operating under a different registration, was involved in a similar accident in 2012 during which the right main landing gear failed in the same location, also due to stress corrosion cracking. This investigation determined that a design solution implemented by the aircraft manufacturer following the 2012 accident, which introduced a protective washer on the forward pintle housing, had not met its original design intent. A fouling condition, not identified when the design solution was first implemented, caused rotational movement of the protective washer on G-GAVA resulting in degradation of the surface protection on the forward pintle housing. This created conditions conducive to the formation of corrosion pits, from which a stress corrosion crack initiated and propagated to failure. This report follows publication of AAIB Special Bulletin S5/2014, in which two Safety Recommendations were made. One additional Safety Recommendation is made.
Conclusion
the AAIB's conclusion, verbatimThe aircraft’s left main landing gear failed as a result of stress corrosion cracking in the forward pintle housing, at the top of the left landing gear cylinder. The landing gear material is known to be susceptible to stress corrosion cracking. The investigation determined that a design solution implemented by the aircraft manufacturer following the 2012 accident, which was intended to prevent stress corrosion cracking, had not met its original design intent.
Safety recommendations
5 issuedwhat changed because of this accident- AAIB 2012-008issued
It is recommended that the European Aviation Safety Agency review the effectiveness of Airworthiness Directive G-003-01-86 in identifying cracks in the yoke pintle housing on landing gears fitted to Jetstream 31 aircraft. Feather lever The worn state of both feather lever detents played no part in the outcome of this accident. However, the inability to lock the lever in the feather position has a safety implication in that it might inadvertently move towards the normal position and open the LP fuel cock. The check at the start of the first flight of the day required the lever to be pulled to ‘engage detent’ but did not make it clear that the lever should lock fully out. The commander believed that the primary purpose of this check was to ensure that the LP Fuel and hydraulic cocks closed when commanded and that there were no control restrictions. The check required the crew to monitor the overhead panel and operate the lever
- AAIB 2012-024issued
It is recommended that BAE Systems Regional Aircraft consider the introduction of a routine inspection on the main landing gear fitted to Jetstream 31 aircraft to detect and monitor the presence of intergranular corrosion in the bores of the yoke pintles. Detection of cracks in the bore EASA AD G-003-01-86 mandates non-destructive testing and visual inspections to identify cracking in the forward yoke pintle housing on landing gears fitted to Jetstream 31 aircraft, with eddy current examinations carried out annually and visual examinations every three months. The heavy corrosion deposits at the start of the crack and previous reports of a ‘dried mud’ appearance indicate that intergranular corrosion can be be present for some time before the crack starts to grow beyond the first few millimetres. Previous work undertaken by the aircraft manufacturer established that once the crack reaches 1.57 mm in length it could then grow, as a result of internal stresses, to 6 mm within 120 days. Once it reaches a length of
- AAIB 2014-038issued
It is recommended that the European Aviation Safety Agency take action to assure the continued airworthiness of those BAE Systems Jetstream 31 main landing gear legs that are manufactured from DTD 5094 aluminium alloy and have SB 32-JM7862 embodied. and,
- AAIB 2014-039issued
It is recommended that the European Aviation Safety Agency take action to mandate an effective inspection regime for the Jetstream 31 that will detect cracking and prevent failure of the yoke pintle of main landing gear legs manufactured from DTD 5094 aluminium alloy.
- AAIB 2015-013issued
It is recommended that the European Aviation Safety Agency require BAE Systems to expedite the proposed aircraft integration trial, to investigate whether any other mechanisms have the potential to cause migration of the special washer or to induce similar damage to the pintle housing. In the event that the ongoing safety actions, when complete, do not adequately assure the continued airworthiness of the landing gear, the manufacturer has indicated that it may have to consider mandating the removal of DTD5094 landing gear cylinders from service.
What an account opens