What happened
AAIB synopsis, verbatimPiper PA-28-161 Cadet, G-TLET Summary: At about 200 ft aal after takeoff the engine suffered a sudden loss of power and the pilot initiated a forced landing. The aircraft touched down in a field at the end of the runway but then it hit a fence, a hedge and a large mound, which caused significant damage to the aircraft. The loss of power was caused by failure of a clamp between the turbocharger compressor outlet and the turbo pipe assembly. This clamp had failed due to a fatigue crack that had initiated at multiple sites on the inner diameter and then propagated through the thickness of the sidewall. Following the accident the maintenance organisation discovered another cracked clamp, which had not yet failed, on another aircraft fitted with the same engine type. Three Safety Recommendations are made.
Conclusion
the AAIB's conclusion, verbatimAnalysis At the time of the accident, and during the investigation, the engine manufacturer was known as Thielert Aircraft Engines GmbH. In July 2013, however, the diesel aircraft engine and manufacturing assets of this company changed ownership and were added to the Continental Motors Group as Technify Motors GmbH. The Safety Recommendations in this report are, therefore, addressed to Technify Motors GmbH. The loss of power in G-TLET was caused by failure of the Wiggins clamp between the turbocharger compressor outlet and the turbo pipe assembly. The clamp had failed due to a fatigue crack that had initiated at multiple sites on the inner surface and then propagated through the thickness of the sidewall. No pre-existing material defects were identified and the clamp wall thickness was within specification. There was significant fretting wear on the inner surface so it was possible that loads due to vibration initiated the fatigue crack. These vibratory loads would have been superimposed on any loads from the compressed air passing through the angled turbo pipe assembly. It is also possible that a misalignment of the pipes during installation could have induced an additional pre-load on the clamp. It was not possible to determine when the crack had formed but the clamp had been in use for at least 793 hours and possibly as many as 1,647 hours – 447 hours in excess of the replacement requirement. The maintenance organisation had been unaware of both the 1,200-hour replacement requirement and the 300-hour ‘remove and inspect’ requirement. Had the clamp been removed for an inspection at the last 300–hour check the crack might have been detected, unless it had initiated after that inspection. The evidence from the clamp from G-BZLH indicates that cracking can initiate in under 300 hours. This clamp had only accumulated 195 hours and it had started to crack in fatigue in the same manner as the clamp on G-TLET. If the crack had gone undetected the clamp probably would have failed with consequent loss of power. The maintenance organisation stated that they had detected the crack on the G-BZLH clamp only because they had removed it following the accident to G-TLET. There was no requirement to remove it Figure 8 Older style clamp (P/N 14C02-24A) which was removed from a Diamond DA40 D in 2012 due to excessive hinge wear
Safety recommendations
3 issuedwhat changed because of this accident- AAIB 2013-018issued
It is recommended that Technify Motors GmbH, as the STC holder, informs operators of Piper PA-28, Cessna 172 and Robin DR400 aircraft fitted with TAE 125-01 and 125-02 engines that the Wiggins clamp (P/N NM-0000-0024701) is susceptible to cracking, which can lead to clamp failure and significant power loss. Furthermore, as TC holder they should inform Diamond Aircraft Industries of the same.
- AAIB 2013-019issued
It is recommended that Technify Motors GmbH establishes a consistent and suitable inspection and/or replacement interval for Wiggins clamp (P/N NM‑0000‑0024701) to be specified in the engine maintenance manuals and the aircraft maintenance manuals for which it holds the Supplemental Type Certificate, to maximise the likelihood that cracks in the clamp are detected before they propagate to failure.
- AAIB 2013-020issued
It is recommended that Technify Motors GmbH re‑assesses the vibration and loading conditions at the clamp and selects an alternate clamp design if necessary to ensure that it is not susceptible to cracking and failure during normal operations.