Douglas DC-8-63F
Manston Airport (Kent International) · 2010-08-11·YA-VIC
What happened
AAIB synopsis, verbatimDouglas DC-8-63F, YA-VIC Summary: During the takeoff the aircraft’s tail skid struck the end of Runway 28 at Manston, and also the soft ground beyond. An approach light for the reciprocal runway was destroyed by the aircraft’s main landing gear. Post-incident calculations showed that the aircraft weight was more than 25,000 lb above the maximum allowable takeoff weight for the prevailing conditions. The investigation highlighted a number of procedural failings by the flight crew, a lack of currency in line operations and a lack of operational oversight and control by the aircraft operator and the regulatory authority in the Islamic Republic of Afghanistan. Four safety recommendations have been made.
Conclusion
the AAIB's conclusion, verbatimAnalysis The FDR data suggests that the initial tailstrike occurred at about 11° pitch attitude, identified by a marked slowing of the rotation rate. As the AOM warned that tailstrike would occurr at 8.95° pitch, the aircraft had probably just become airborne when the tail skid contacted the runway. After the initial tail strike the right main gear struck the raised approach light. The aircraft then continued to rotate as a result of the increased control input, causing the tail skid to contact the soft ground beyond the runway end. A second, lesser, reduction in pitch rate is evident on the FDR data at about 13° pitch, which probably marks the second tail strike. The time interval between pitch events is about 1.5 seconds, which is equivalent to the time the aircraft would have taken to travel the distance between start and finish of the ground marks at the liftoff speed. Therefore, the tailstrike most probably occurred because of a deviation from the correct rotation technique, probably an instinctive reaction on the part of the commander to the rapidly approaching runway end. The overweight takeoff was thus a major contributory factor, and the lack of recent aircraft handling experience is also likely to have contributed. Collectively, the flight crew was responsible for ensuring that the aircraft met the applicable performance requirements for takeoff, but this was not done. Although lacking recent experience on type, each of the operating and positioning crew were experienced on type and familiar with the requirements. Despite
Safety recommendations
4 issuedwhat changed because of this accident- AAIB 2011-006issued
It is recommended that the Ministry of Transport and Civil Aviation (MoTCA) review its processes for the regulatory oversight of commercial aircraft operators based in the Islamic Republic of Afghanistan. When foreign states seek to satisfy themselves that applicable international standards have been met, they are dependent upon the regulatory authority in the State concerned exercising effective oversight of the airlines within that state. In this case, the operator was in posession of the required approvals from the MoTCA and thus there was no evident reason for UK DfT to withold an operating permit. ICAO, through its Universal Safety Oversight Audit Programme, carries out auditing of safety oversight systems in Contracting
- AAIB 2011-007issued
It is recommended that the International Civil Aviation Organisation (ICAO) establish an alternative to the USOAP (Universal Safety Oversight Audit Programme) procedure for those states, such as the Islamic Republic of Afghanistan, where security, or other, concerns prevent regular on-site auditing.
- AAIB 2011-008issued
It is recommended that the International Civil Aviation Organisation (ICAO) conduct an aviation safety oversight audit of the Islamic Republic of Afghanistan.
- AAIB 2011-009issued
It is recommended that the UK Department for Transport (DfT) review their process for the issue of permits to aircraft operators where the ICAO auditing system does not provide an appropriate level of confidence in the State’s regulatory oversight. States but, as described earlier, United Nations travel restrictions have prevented an ICAO USOAP audit in Afghanistan and a number of other States. The following two Safety Recommendations are made:
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.