AAIB synopsis, verbatimBombardier DHC-8-102, SX-BIO Summary: After a base maintenance check at Exeter the aircraft was flown uneventfully to East Midlands to be re-painted. During the return flight to Exeter the right engine suffered a significant oil leak and lost oil pressure, so the flight crew shut it down. Subsequently, the crew noticed the left engine also leaking oil, with a fluctuating oil pressure, so they initiated a diversion to Bristol, where they landed safely. The oil leaks were traced to damaged O-ring seals within the oil cooler fittings on both engines. Both oil coolers had been removed and refitted during the base maintenance check at Exeter. It was probably during re-installation that the O-ring seals were damaged. A number of factors led to this damage and to missed oil leak checks. Six Safety Recommendations are made.
Conclusion
the AAIB's conclusion, verbatimThe oil leaks from both engines were caused by damaged O-ring seals at the oil cooler fittings. This damage probably occurred when both oil coolers were improperly re-installed by the same individual during base maintenance. The limited repair instructions had resulted in the unnecessary removal of the oil coolers and the re-installation of the coolers had not been identified as safety critical tasks. Following the oil cooler re‑installation it was not documented that an oil leak check would be required, due to incomplete planning of the tasks on a ‘defect job card’. The incorrect diagnosis that the slow oil seepage from both engine nacelles was residual oil from a previous leak led to the source of the leaks not being fully investigated at East Midlands. Extract from Transport Canada’s Fatigue Risk Management System, Policies and Procedures Development Guidelines (TP 14576E, April 2007)
Safety recommendations
6 issuedwhat changed because of this accident- AAIB 2011-014issued
It is recommended that Flybe Aviation Services revise their practices and procedures to ensure that their repair instructions are adequately detailed and specify the necessary access and removal requirements. Removal and refit of the oil coolers was not identified as a safety critical task When it was decided that both oil coolers needed to be removed from the aircraft, these tasks should have been identified as safety critical. If a person makes an error while disturbing the oil system on one engine, and then repeats the error on the other engine, the safety of flight of a twin-engined aircraft can be compromised. This was the case in the incident to the Boeing 737‑400 (G-OBMM) that lost almost all its oil from both engines due to the rotor driver covers not being refitted following borescope inspections on both engines by the same person. The AMO agreed that the oil cooler re-installation tasks should have been identified as safety critical tasks and should have been carried out by different people. The
- AAIB 2011-015issued
It is recommended that Bombardier Inc. amend the Aircraft Maintenance Manual for the DHC-8-100 series aircraft to emphasise the correct procedure for securing the inlet and outlet pipes to the engine oil coolers, including the method for tightening the associated knurled nuts. Task breakdown on ‘defect job cards’ The final step of the oil cooler installation procedure in the AMM called for an engine ground run and leak check of the coolers. This step was not written on the ‘defect job card’ and, therefore, at the end of the maintenance check when the engine ground runs were carried out, the engineer involved did not know that an inspection of the oil coolers was required. In the event, the leak from the left engine was obvious and the left oil cooler was visually inspected. However, had the leak not been so obvious then the left oil cooler may not have been inspected. It was not clear if the right oil cooler had been inspected. The omission of the leak check task from the job card was therefore a significant omission. The tasks on the job card (which was a ‘defect job card’ for the bushing repair) were written by a number of individuals, rather than all tasks being pre‑planned. For example, the task after ‘refit oil
- AAIB 2011-016issued
It is recommended that Flybe Aviation Services review their defect rectification processes to ensure that important safety checks, such as oil leak checks, are not omitted. Engine oil leak checks at Exeter Although there was no plan to specifically check the oil coolers for leaks, engine ground runs were required to be carried out to test systems and check for other oil leaks. During the first ground run which lasted about
- AAIB 2011-017issued
It is recommended that Flybe Aviation Services remind all staff of the importance of investigating the source of every engine oil leak. Working hours and fatigue risk management In the 17-week period leading up to the end of SX‑BIO’s C-check, Sup A had worked an average of 57 hours/ week which was 9 hours/week in excess of the Working Time Regulations (WTR). Furthermore, during the
- AAIB 2011-018issued
It is recommended that the European Aviation Safety Agency expand the advisory or guidance material in Annex II (Part 145) of European Commission Regulation (EC) No. 2042/2003 on how approved maintenance organisations should manage and monitor the risk of maintenance engineer fatigue as part of their requirement to take human performance limitations into account. Oversight of the AMO by the Civil Aviation Authority (CAA) The CAA is required to conduct annual audits of the AMO to ensure that the AMO complies with the requirements of Part 145. At the time of writing, the last audit was carried out in June 2010. In order to ensure that the safety lessons from this investigation have been adopted by the AMO, the following Safety Recommendation is made:
- AAIB 2011-019issued
It is recommended that the Civil Aviation Authority include the following areas in their Part 145 audits of Flybe Aviation Services: practices and procedures for detailing repair instructions, identification of safety critical tasks, planning of defect rectification and management of maintenance engineer fatigue.