UK AAIB AAIB-2010-GCBWJ · UK AAIB · Field investigation
Thruster T600N 450
Bradley Lawn Farm, Heathfield, East Sussex · 2010-08-02·G-CBWJ
Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
—
damage
What happened
AAIB synopsis, verbatimThruster T600N 450, G-CBWJ Summary: At approximately 300 ft agl, just after takeoff, the propeller blades, hub and mounting flange detached from the engine, forcing the pilot to land in a nearby field. Forensic examination of the failed flange mounting screws identified high cycle fatigue, possibly due to relative movement between the flange and crankshaft following loss of clamping load.
Conclusion
the AAIB's conclusion, verbatimAnalysis The forensic analysis indicated that five of the six screws suffered fractures due to HCF. The remaining screw’s (screw 5) fracture surface was damaged after failure, though some evidence of fatigue and overload were identifiable. The cracks within the screws initiated in two regions diametrically one another, suggesting a reversed bending load pattern. However, the orientations of each initiation relative to the crankshaft show that they all aligned tangentially. This may indicate relative rotational movement between the flange and the crankshaft. Therefore, the most likely cause of failure of the screws was a loss of clamping load on the flange, due to reduced torque load on the mounting screws. This would allow movement between the flange and the crankshaft and create an additional load cycle on the flange screws related to the engine rpm. HCF cracks developed from initiation points in areas of stress concentration within the screw threads, until the critical crack length was reached and the screws failed in overload. The flange and propeller then released during the incident flight. This incident highlights the importance of installing the propeller mounting flange in accordance with the engine manufacturer’s guidance detailed in service bulletin JSB 022-1 and inspecting the flange screws in accordance with the manufacturer’s recommended maintenance schedule. Both of these documents are freely available on the manufacturer’s website.
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.