Avro 146-RJ100
13 February 2009 London City Airport · 2009-02-13·G-BXAR
What happened
AAIB synopsis, verbatimAvro 146-RJ100, G-BXAR Summary: Following an uneventful ILS approach to Runway 27 at London City Airport, the nose landing gear collapsed as it was lowered onto the runway during the landing. The cockpit and cabin subsequently filled with dense smoke. After coming to a stop, all passengers and crew evacuated the aircraft on the runway. Three passengers were subsequently treated for minor injuries and two were kept in hospital overnight. The nose landing gear had fractured due to the presence of a fatigue crack in the upper internal bore of the landing gear main fitting. The crack had formed as a result of poor surface finish during manufacture and the incomplete embodiment of Messier Dowty Service Bulletin SB146-32-150, which the landing gear maintenance records showed as being implemented at its last overhaul in June 2006. CAA Airworthiness Directive 002-06-2000 mandated BAE Systems Service Bulletin 32-158, which referred to Messier Dowty SB146-32-149; this required repetitive inspections of of the nose landing gear. As SB 146-32-150 was the terminating action for Service Bulletin SB 146-32-149, the operator was not then required to conduct any repetitive in-service inspections designed to detect the onset of fatigue cracks.
Conclusion
the AAIB's conclusion, verbatimFollowing a normal touchdown, the fracture of the nose landing gear main fitting allowed the nose gear to collapse rearwards and penetrate the lower fuselage, causing significant damage to the equipment bay and the battery to become disconnected. The penetration of the fuselage allowed smoke and fumes produced by the consequent release of hydraulic fluid to enter the cockpit and passenger cabin. With the battery Figure 4 Fracture surface of main fitting Region of fatigue cracking
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.