FlarePath
UK AAIB AAIB-2006-TFCSB · UK AAIB · Field investigation

Dornier 328 100

Aberdeen Airport · 2006-06-22·TF-CSB

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
Minor
damage

What happened

AAIB synopsis, verbatim

Dornier 328 100, TF-CSB Summary: During the landing roll, the crew were unable to decelerate the aircraft sufficiently because they were unable, repeatedly, to select the power levers into the beta range. The aircraft overran the runway and the Runway End Safety Area, coming to rest some 350 metres beyond the end of the runway. There were no injuries. Three Safety Recommendations are made.

Conclusion

the AAIB's conclusion, verbatim
Analysis There have been a number of events in which pilots have experienced difficulties in selecting ground idle after landing, or other difficulties in moving Dornier 328 power levers. Actions taken as a consequence of these events have been to alter the maintenance procedure for the power levers (on the assumption that wear and/or lubrication is the cause) or to instruct pilots to alter their technique. Pilots have also been trained to deal with such a problem after landing, with one UK operator carrying out simulator training of its crews to enable them to carry out a baulked landing (effectively, a go-around after the aircraft has touched down). This procedure acknowledges that, if the power levers are not retarded to ground idle soon after touchdown, it may not be possible to stop the aircraft. Factors giving rise to this difficulty include the relatively high thrust of the Dornier 328’s powerplants, the rapid rate at which it is progressing along the runway soon after landing, and the relatively limited braking capacity required by turbopropeller aircraft in general. The operator of TF‑CSB had not carried out this training, but its operations manual did instruct pilots how to deal with a power lever jam. The instructions in the operations manual, to advance and then retard the power levers in order to resolve a jam, appear, at first sight, to be reasonable. However, there is a tacit assumption that this procedure will be effective, the jam will be cleared, and there will be sufficient runway remaining on which to stop the aircraft. On a limiting runway, this may well not be the case, and if a crew find it necessary to carry out these actions (as did

Safety recommendations

3 issuedwhat changed because of this accident
  • AAIB 2006-104issued

    It is recommended that Avcraft Aerospace GmBH i.I advise all operators of Dornier 328 turboprop aircraft to detail procedures, and provide adequate training, to ensure that their pilots are able to act appropriately if the beta control range on the power levers cannot be selected after landing. The CAA responded to this Safety Recommendation as follows: ‘This Recommendation is not addressed to the CAA. However, the recommendation has been acted upon by the CAA and Inspectors, assigned to the UK companies operating Do328 aircraft, have been made fully aware of the issue and will be discussing the incident with the companies as necessary.’ In December 2006 the Type Certificate holder published Temporary Revision 20-006 to the Airplane Operating Manual, which introduced an option of a baulked landing, to be carried out at the pilot’s discretion, if a power setting below Flight Idle could not be achieved. This was supported by the re-issue of Flight Ops Information FOI-328-76-01 on 19 December 2006. Protection of the overrun area The aircraft came to rest 350 metres beyond the end of the runway. CAP 168 ‘Licensing of Aerodromes’ defines a ‘Runway Strip’ as follows: ‘A runway strip is an area enclosing a runway and any associated stopway. Its purpose is to…

  • AAIB 2007-103issued

    The Luftfahrt-Bundesamt should ensure that a training programme, fully alerting Dornier 328 crews to the potential for restricted movement and the optimum operation of the lever/latch combination, and detailing appropriate operational procedures, be developed and

  • AAIB 2007-104issued

    The European Aviation Safety Authority should require the Dornier 328 Type Certificate holder to re-design the power lever/beta/reverse latch system to improve the present arrangement.

In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.