What happened

AAIB synopsis, verbatim

Socata TB10, G-BNRA Summary: This accident was the subject of AAIB Special Bulletin S2/2006. A propeller blade detached during a touch and go landing, leading to loss of the propeller and partial separation of the engine from the aircraft. An existing Manufacturer’s Service Bulletin was identified as being relevant to the failure. Three Safety Recommendations were made, to the Civil Aviation Authority (CAA), the Federal Aviation Administration (FAA) and the European Air Safety Agency (EASA). Subsequent metallurgical analysis confirmed the cause as a fatigue failure. Since publication of the Special Bulletin, the CAA has issued a Letter to Operators on the subject and the FAA have produced an appropriate Airworthiness Directive.

Conclusion

the AAIB's conclusion, verbatim
The engine partly separated from the airframe as a result of propeller imbalance following the release of one blade due to fatigue failure in its hub. The fatigue cracking appears to have been partly a consequence of non-optimum temperature conditions in the hub material during the forging process. Recommendations within an existing Service Bulletin addressed the problem although the absence, at the time, of an Airworthiness Directive rendering such checks mandatory contributed to its non-implementation on this aircraft before the accident. The UK CAA, the EASA and the FAA have all responded positively to contain the hazard by introducing inspections and/or replacement of the hub parts.

Safety recommendations

3 issuedwhat changed because of this accident
  • AAIB 2006-046issued

    It is recommended that the CAA take immediate action to alert M3 organisations and other relevant maintainers in the UK to the existence and importance of Hartzell Service Bulletin HC-SB-61-269. Figure 3 Hub fracture faces

  • AAIB 2006-047issued

    and has introduced an Airworthiness Directive 2006-18-15 which is subject to a consultation process but which must, nonetheless, be implemented by 25 September 2006. It requires adoption of an inspection procedure in accordance with the existing Hartzell Service Bulletin. On 3 May 2006 the EASA responded to Safety Recommendation 2006-048 by issuing Airworthiness Directive No 2006-0092, which mandated the inspection procedure or optional terminating action (replacement of the hub) described in the Hartzell Service Bulletin. Conclusions The engine partly separated from the airframe as a result of propeller imbalance following the release of one blade due to fatigue failure in its hub. The fatigue cracking appears to have been partly a consequence of non-optimum temperature conditions in the hub material during the forging process. Recommendations within an existing Service Bulletin addressed the problem although the absence, at the time, of an Airworthiness Directive rendering such checks mandatory contributed to its non-implementation on this aircraft before the accident. The UK CAA, the EASA and the FAA have all responded positively to contain the hazard by introducing inspections and/or replacement of the hub parts.

  • AAIB 2006-048issued

    It is recommended that the EASA take urgent steps to issue an Airworthiness Directive making the inspection requirements of Hartzell Service Bulletin HC-SB-61-269 mandatory. Regulatory responses to Safety Recommendations The CAA has since responded to Safety Recommendation 2006-046 as follows: The CAA accepts this recommendation insofar as it relates to the need to alert relevant persons to the existence and importance of Hartzell Service Bulletin HC-SB-61-269. To that end CAA issued, on 30 March 2006, a letter to relevant UK operators strongly recommending that owners of aircraft affected by Hartzell Service Bulletin HC‑SB-61‑269 arrange for an eddy current inspection to be performed in accordance with the Service Bulletin instructions as soon as possible. Since that letter, the Federal Aviation Agency has responded to Safety Recommendation 2006-047 and has introduced an Airworthiness Directive 2006-18-15 which is subject to a consultation process but which must, nonetheless, be implemented by 25 September 2006. It requires adoption of an inspection procedure in accordance with the existing Hartzell Service Bulletin. On 3 May 2006 the EASA responded to Safety Recommendation 2006-048 by issuing Airworthiness Directive No 2006-0092, which mandated the inspection