What happened
AAIB synopsis, verbatimBoeing 737-528, G-GFFE Summary: During ground operation, the cast inflow turbine of the APU suffered a radially contained failure. This resulted in vanes separating from the casting as its two liberated halves came into rapid contact with the containment structure. The hot vane debris was ejected through the jet pipe and spread across the rear of the stand and the width of the adjacent taxiway. The failure was one of nine broadly similar events to the type of turbine wheel, each attributed to a casting defect. Efforts have been made to improve the manufacturing process, without proven success, and no reliable method has been found to detect the defect in new or existing turbines. No method of establishing a safe in-service life has been determined for this component but the hazard to airport staff remains very low.
Conclusion
the AAIB's conclusion, verbatimThe casting process of the turbine of APS 2000 and 2001 APUs produces occasional and unknown quantities of oxide films within the turbine core. The size and orientation of these films occasionally leads to fatigue crack initiation and growth to failure under working stresses. However, the number of hours/cycles to failure of turbines with such defects cannot be predicted. Considerable experimental and analytical work has been carried out over an extended period by the APU manufacturer and the casting supplier to eliminate the oxide film problem. These efforts have not been successful. APUs utilising cast inflow turbines have a history of occasional radially contained turbine bursts. No direct hazard to an aircraft is understood to have resulted from such contained failures of an installed APU and current certification requirements for containment appear to have been met. No other reports of large quantities of high speed debris travelling equivalent distances behind APS 2000 equipped aircraft have been received and nobody has been injured by ejected debris. No changes to the design or manufacturing process of the APS 2000/2001 turbine can be envisaged that can be guaranteed to reduce the number of such failures without running the risk of making the situation worse. Revised apron procedures to protect staff from ejected debris were not considered necessary but staff could usefully be reminded to avoid lingering within 300 ft downstream of an operating APU.
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.