Falcon 900EX
London (Stansted) Airport, Essex · 2004-02-09·VP-BMS
What happened
AAIB synopsis, verbatimFalcon 900EX, VP-BMS Summary: The aircraft departed from Kilimanjaro en route to London (Luton) airport with a known hydraulic problem. The crew believed, incorrectly, that this was allowed under the terms of the Minimum Equipment List. During the approach at Luton the crew were unable to obtain indications that the gear was down and locked following selections on both the normal and emergency systems. The crew requested a diversion to Stansted and the aircraft was configured for a full flap landing on Runway 05. During the landing roll the right main landing gear partially retracted and the aircraft veered to the right until it finally left the paved surface, crossed the grass, and came to rest about 139 metres to the right of the runway centreline. Four safety recommendations have been made as a result of the investigation.
Conclusion
the AAIB's conclusion, verbatimDiscussion The crew arrived in Kilimanjaro aware of an indication of an intermittent fault to the No 3 hydraulic pump. They consulted the MEL and believed, incorrectly, they could depart with this pump unserviceable. This, combined with the limited repair facilities available, persuaded them to defer this defect until their return to London (Luton) Airport. The crew had misinterpreted their MEL. Section 29.1 of the MEL allows dispatch with two of the three caution lights serviceable and not two of the three hydraulic pumps as the crew believed. The MEL also requires that two operational provisions are addressed and these, when read in conjunction with their associated procedures, make it quite clear that this section of the MEL concerns the caution lights. However, the crew appear to have been deceived by the relative unimportance of the term 'Caution Lights' which was printed in lower case and appeared after the listing of the three hydraulic pumps which were printed in capital letters. If the term 'Caution Light' had appeared after each caption ie 'HYDR#1 Pump 1 Caution Light' there would have been less room for misunderstanding. Any MEL must be read in a thorough manner since partial reading of any item can easily lead to misinterpretation. However, the MEL is not a document that is used frequently and should therefore be presented in the most clear and unambiguous manner available. On their departure four days later the No 3 hydraulic pump continued to indicate an intermittent fault until 15 minutes after engine start when it then failed completely. Loss of this pump should have had minimal impact on the operation of the aircraft; however, there was also a continuing loss of hydraulic fluid, through a leak in the No 1 hydraulic pump although the time at which this leak commenced is unclear. This leak and the failure to the No 3 hydraulic pump were probably independent. Even though it is not known precisely when the leak developed loss of fluid was observed by the crew after a flight time of between one and two hours. The leak resulted in the hydraulic quantity indication reducing to zero during the flight. The zero level in the hydraulic reservoir may have been slightly offset, so that a sufficient minimum quantity of fluid was circulating in the No 1 hydraulic system, thus explaining the normal pressure in the system and the absence of a HYDR#1 PUMP 1 caution light. In cruise conditions, with low requirements for hydraulic power, the duration of this condition would depend on the rate of fluid loss. At the time of flap and slat extension, the increased requirement caused the final loss of the No 1 hydraulic system. The crew expected that indications of the loss of the No 1 hydraulic system would include a reduction in pressure; however, since this did not occur the crew did not believe that they had lost the system. As a precaution, however, they considered what they would do if the system subsequently failed when configuring the aircraft for landing. This would require lowering the landing gear using the free-fall system, and would deny them the use of normal braking and normal slat extension. They also considered the required adjustments to the planned approach speed and the landing distance required before finally confirming that Luton's runway had sufficient landing distance available. However, during the remainder of the flight to Luton the crew did not consult the AFM but relied on their 'training' checklist. The complete failure of the No 1 hydraulic system became apparent to the crew when they selected the slats on approach to Luton Airport. The emergency slat system worked correctly although the crew failed to receive the flashing green indication they were expecting; however, this condition was allowed for in the procedure that they were using. The initial attempt to lower the landing gear resulted in three red but no green gear position indicating lights; these were the expected indications following the loss of the No 1 hydraulic system. When conducting the subsequent Emergency Gear Extension procedure the crew operated both Main Gear Manual Release Handles then the Nose Gear Manual Release Handle and each element of the gear deployed but, as expected, none of them achieved a downlock indication. This sequence was at variance with the Emergency Gear Extension procedure which required that each main gear is locked down, through the application of sustained sideslip, before the Nose Gear Manual Release Handle is pulled. Furthermore, evidence from the FDR indicates that the flight crew did not sideslip the aircraft to a sufficient degree and for sufficient time to provide the necessary aerodynamic loads on the main gear and did not accelerate sufficiently to provide the required aerodynamic loads on the nose gear. The reason for not doing so can be ascribed to the checklist they were using, which failed to clearly define the parameters required to lock the gear. In addition, the training that the crew had experienced in the flight simulator led them to believe that when manually deploying the landing gear only the minimal use of the rudder was required to provide sufficient sideslip to lock the main gear down. Moreover, evidence from the CVR indicates that the crew was concerned by the apparent failure of the emergency deployment handles, which they incorrectly believed was the cause of the gear failing to lower and lock. It seems most probable that all three gears were just short of entering the downlocks before touchdown. Whilst on the runway, any sideways movement would have had the effect of locking one main gear and retracting the other, and this is consistent with the effect of the slight crosswind reported, causing the left gear to lock. The nose landing gear was probably locked down by the initial drag force whilst making contact, wheel spin-up at first contact or possibly by the slight shock of main landing gear first contact. The point a
Safety recommendations
4 issuedwhat changed because of this accident- AAIB 2005-023issued
After landing at Kilimanjaro with indications of an intermittent fault to the No 3 hydraulic pump the crew consulted the Minimum Equipment List and concluded, incorrectly, that they could depart with an unserviceable hydraulic pump. Whilst it is clear that a Minimum Equipment List must be read in a thorough manner the crew appear to have been deceived by the presentation of the information in this instance. The MEL is not a document that is used frequently, which makes it particularly important that it should be presented in the most clear and unambiguous manner available. It is therefore recommended that Dassault Aviation should review Section 29, Part 1 of the Master Minimum Equipment List to make it clear that this refers to the pump caution lights and not the pumps.
- AAIB 2005-024issued
During the flight to London (Luton) Airport, following a failure of the No 3 hydraulic pump, there was a continuing loss of hydraulic fluid through a leak in the No 1 hydraulic pump which resulted in an indication of zero contents in the No 1 hydraulic system. The crew, however, was confused by the fact that the system indicated normal hydraulic pressure despite the apparent total loss of fluid. It is therefore recommended that Dassault Aviation review the indications likely to be seen following a failure of either hydraulic system and, if necessary, amend the checklist accordingly.
- AAIB 2005-025issued
Training Organisations will often provide their own documentation "FOR TRAINING PURPOSES ONLY" in an attempt to provide simplified, structured guidance to pilots during training. However, whilst providing clarity they also have an obligation to ensure that this training documentation accurately and thoroughly reflects the information provided in the manufacturer's operations manual. Moreover, the documentation and procedures promoted during training should be those that the flight crew will use in the aircraft. It is therefore recommended that FlightSafety International should review their process for ensuring the accuracy of the documents used in training and should promote the same procedures used in training that will be used when flying the aircraft.
- AAIB 2005-026issued
The fidelity of modern flight simulators is such that non-normal training can now be conducted in the flight simulator and need not be completed on the aircraft; indeed, some non-normal drills such as manually lowering the landing gear following the loss of the No 1 hydraulic system can only be safely conducted in the simulator. Notwithstanding the required level of fidelity for the qualification standard of the simulator it is clear that in this case the forces required to lock down each element of the landing gear were not representative of those necessary in the aircraft. It is therefore recommended that FlightSafety International, in coordination with Dassault Aviation, should review their flight simulators used for Falcon 900 training to ensure they represent with acceptable realism the correct pilot input, as defined in the operations manual, to successfully lock down the landing gear during emergency gear extension.
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.