0
fatal
0
serious
No injury
highest injury
—
damage

What happened

AAIB synopsis, verbatim

DHC-8-311 Dash 8, G-JEDE Summary: The crew were flying a manual approach to Runway 10 at London City Airport. During the flare, with the commander as the handling pilot, the tail struck the ground, with damage limited to the skin of the fuselage. The commander reported heavy sink during the flare and the surface wind was 360º/8 kt. The FDR trace showed that the amount of torque at touchdown was significantly less than usual.

Conclusion

the AAIB's conclusion, verbatim
Analysis Data from the FDR suggests that at handover of control from the first officer to the commander, the aircraft was on the glideslope and 12 kt slower than that specified in the company SOPs. The commander then reduced engine torque to an unusually low level in order to reduce the speed to VREF as soon as possible. Comparison with three other landings at LCY showed that this was the only occasion that engine torque was significantly reduced after handover of control. The effect of this was to destabilise the power on the final stages of the approach and, although the torque started to increase 10 seconds prior to the tail strike, it never attained the levels normally achieved on LCY landings. This low power setting combined with an airspeed close to VREF provided the aircraft with less energy than normal approaching the flare. Without significant power increase and with the onset of sink, the pitch angle had to be increased rapidly to reduce the rate of descent, resulting in the tail strike. The company SOP regarding speed control on the precision approach into LCY required the aircraft to decelerate from 120 KIAS at decision height to 91 KIAS at touchdown whilst maintaining a 5.5º approach. It is difficult however, to reconcile achieving this whilst maintaining a stabilised approach. Analysis of other approaches into LCY on this airframe reveal that commanders have chosen to fly stabilised approaches and accepted landings at speeds sometimes considerably higher than VREF. There is anecdotal evidence of the commander's air speed indicator over reading which may have led to commanders maintaining higher landing speeds. The Landing Distance Available (LDA) at LCY is such that there are no performance issues with this type of aircraft if touchdown is achieved at the correct point and this probably influences commanders to accept the higher touchdown speeds. When aiming to land at VREF from this type of steep approach, the company advice to 'maintain engine power in the flare' is significant. This extra energy combined with the increased lift from the propeller slipstream over the wings allows the rate of descent to be reduced without a large increase in pitch angle. Although the commander considered that the aircraft may have been subject to the wind effects from proximate buildings, this is unlikely with such a low wind speed. However, the effects of wind around existing buildings have not been studied and the airport's proactive stance towards future development and their effect on wind conditions is to be commended. Follow up actions As a result of this incident the commander received three days of line training with a company type rating examiner (TRE) and was released back to line flying. For reasons unconnected with this incident, the company no longer operates this type of aircraft and has withdrawn all operations from LCY. Figure 1 FDR Parameters for G-JEDE on 29 November 2004