UK AAIB AAIB-2004-GFFRI · UK AAIB · Field investigation
Aerospatiale AS355F1
Near Lasham Airfield, Hampshire · 2004-07-19·G-FFRI
Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
—
damage
What happened
AAIB synopsis, verbatimAerospatiale AS355F1, G-FFRI
Conclusion
the AAIB's conclusion, verbatimDiscussion The reports into the G-OHMS and G-WMPA incidents describe the various factors which could be instrumental in failure of Thomas couplings, namely: 1 Degraded MRGB bilateral suspension 2 Relaxed torque on the Thomas coupling flange 3 Disconnection of the gimbal joint on the coupling housing tube due to loss of a quick- release ‘Terry’ clip It is evident that degradation of the engine elastomeric mount should be added to this list, since it appears to have the same potential as a degraded MRGB suspension to provoke misalignment leading to fatigue cracking of the flector leaves. No evidence was found that either item No 1 or item No 3 above were responsible for the failure of the Thomas coupling of G-FFRI. It is regrettable that any evidence regarding the condition of the coupling flange bolts seems lost, particularly in the light of a discovery made by the same maintenance company in January 2005 and brought to the attention of the AAIB. During routine maintenance on an AS355F2 helicopter (not G-FFRI), it was necessary to dismantle the engine drive Thomas couplings. Four of the six nuts and bolts seemed quite normal but two showed signs of severe frettage of both the nut and the bolt, apparently caused by a loose-fitting split pin (Figure 2). The pins themselves were intact but, as can be seen from Figure 2, the loss of material from the nut is considerable. Informal contact with another maintenance company suggested that they, too, had experience of this phenomenon as did an AAIB consultant metallurgist who had observed it in applications other than helicopters. The helicopter had flown a total of 5,597 hours since new and the combining gearbox had a total of 1,072 hours since overhaul (overhauled gearboxes are supplied with new Thomas couplings and hence bolts).
Safety recommendations
1 issuedwhat changed because of this accident- AAIB 2005-081issued
It is recommended that Eurocopter review the design, or maintenance procedures adopted for the installation, of ‘flector’ couplings to ensure that the potential for fretting of the split-pin/nut/bolt assembly is eliminated. Figure 2 A coupling flange nut and bolt removed from a Thomas coupling fitted to an AS355 helicopter showing severe fretting caused by a loose-fitting split-pin
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.