Mooney Aircraft Corporation M20J
Jersey Airport · 2004-10-16·G-EKMW
What happened
AAIB synopsis, verbatimMooney Aircraft Corporation M20J, G-EKMW Summary: Shortly after take off, the aircraft suffered an engine malfunction and the pilot attempted to return to the airfield. During the turn, the aircraft appeared to stall and impacted the ground in a nose low attitude, fatally injuring the pilot. A defect was discovered within the engine’s dual magneto, which had recently been refitted following a 500 hr inspection, affecting both ignition systems. This led to a loss of power, accompanied by misfiring, that was consistent with aural evidence from witnesses. Issues concerning quality control of maintenance activities and maintenance data were identified during the investigation. Four safety recommendations are made.
Conclusion
the AAIB's conclusion, verbatimAnalysis Sequence of events The pilot’s ‘emergency’ PAN/MAYDAY radio call included the phrase “rough running”, twice, and this was confirmed by witnesses on the ground who reported hearing the engine making popping/backfiring noises as the aircraft reached about 200 ft in the climbout. The period of time over which the engine was heard to make these unusual noises could not be established exactly, but was unlikely to have been more than a few seconds. Shortly after the radio call, the aircraft was seen to turn left, through approximately 90º, before the left wing dropped and the nose sliced down, following which it entered a steep descent into the ground. Examination of the aircraft’s wreckage showed that the engine was stopped, or practically stopped, and that it was either in the incipient stages of a spin to the left or, possibly, that it was in the process of recovering from a spin to the left, at the time it struck the ground. From an operational perspective, the pilot was forced into handling an engine problem at one of the most critical stages of flight, ie, shortly after takeoff, but too late to permit a landing immediately ahead on the runway distance remaining. He therefore had to decide whether to return to the airfield, or to attempt a forced landing in the area ahead of the aircraft. The ground in potential gliding range of the aircraft, from its maximum height of around 300 ft aal, contained few areas suitable for a forced landing and the pilot was likely to have been aware of this from his many previous departures
Safety recommendations
4 issuedwhat changed because of this accident- AAIB 2006-028issued
It is recommended that International Aerospace Engineering review their internal processes to ensure that they comply with the standards required under their EASA Part 145 approval focussing, in particular, on areas relating to the provision of maintenance information and staff training. In response to this recommendation IAE has stated that: ‘it believes that it does comply with the standards required under its EASA [Part] 145 approval. It continues to monitor such compliance as a necessary and ongoing element of its business.’
- AAIB 2006-029issued
It is recommended that the Civil Aviation Authority review their quality audit programmes, which underpin its EASA Part 145 approvals of maintenance organisations, to ensure that such audits include adequate sampling and objective scrutiny of the physical engineering activities. In response to this recommendation the CAA have stated the following: ‘From a regulatory standpoint, CAA oversight and audit methodology is established to satisfy the EASA Part 145 Regulations. A review of the audit records completed over the last three years for this organisation shows that as well as regulatory compliance verification checks, audit samples of three examples from the product line were carried out on each visit’ It is not the regulators role to implement a quality audit programme to supplement that of the approved organisation’ The CAA have also stated that they recognise the utilisation of pre-planned work/process sheets, where appropriate, represents best practice, and the adoption of this practice is encouraged. However, they cannot require EASA Part 145 organisations to implement this practice if it is not specified within the Regulation. The following safety recommendation is therefore made:
- AAIB 2006-030issued
It is recommended that the European Aviation Safety Agency (EASA) should amend the EASA Part 145 Regulation to require that EASA Part 145 approved maintenance and component overhaul organisations use pre-planned work/process sheets when carrying out work on safety critical components. Whilst the extent to which the outdated manual actually contributed to the technician not replacing the screw could not be determined, there is no doubt that, if the
- AAIB 2006-031issued
It is recommended that the Federal Aviation Administration require Teledyne Continental Motors to conduct a critical review of their processes for the support of maintenance organisations which maintain/ overhaul their products, to ensure that concise and current technical data, and spare parts of acceptable quality, are always readily available. In response to this safety recommendation, Teleydyne Continental Motors has stated the following: • TCM will critically review its technical publication management system, and will maintain current publication status on-line • TCM has reviewed and re-written the process to improve the release of approved documentation • TCM uses Service Bulletins to expedite dissemination of updated technical information • TCM encourages customer feedback regarding technical information in its technical publications • TCM customers can receive ‘kits’ that include all the necessary replacement parts for magneto inspections or overhauls • TCM takes steps to verify supply chain quality, is subject to FAA audits, annual reviews per AS9001 standard, and only uses approved suppliers/distributors.
What an account opens
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.