FlarePath
UK AAIB AAIB-2003-GXLAG · UK AAIB · Formal report

Boeing 737-86N

Manchester Airport · 2003-07-16·G-XLAG

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
Minor injury
highest injury
—
damage

What happened

AAIB synopsis, verbatim

Summary: G-XLAG, a Boeing 737-86N, with seven crew and 190 passengers on board, was undertaking a flight from Manchester Airport to Kos, Greece. Runway 06L was in use but the flight crew were not aware that this runway was being operated at reduced length. This was due to work-in-progress to remove rubber deposits at the far end of the runway, which was out of sight from the 06L threshold end as the runway was built over a slight rise in the ground. Due to a difference in interpretation of information passed between Air Traffic Control (ATC) and the flight crew, the aircraft entered the runway from holding point AG, rather than the expected holding point A, and the takeoff was conducted using a reduced thrust setting calculated for the assumed normal runway length. As the aircraft passed the crest of the runway, the flight crew became aware of vehicles at its far end but, as they were now close to their rotation speed, they continued and carried out a normal takeoff. The aircraft passed within 56 ft of a 14 ft high vehicle. This serious incident was notified to the AAIB at 1724 hrs on 23 July 2003, seven days after it had occurred. The subsequent investigation revealed further incidents had occurred during the course of the work, the most significant being on the night of 15 July 2003. On this occasion ATC had instructed three commercial passenger aircraft to go-around after they had knowingly positioned them to land on the reduced length runway. The crews of all three aircraft were unaware of the reduced length available and, when informed, stated that it was insufficient for them to be able to land. The closest of the aircraft, a Tristar, was at a range of 2.5 nm when instructed to go-around. The actions of Manchester Airport plc (MA plc) and National Air Traffic Services (NATS) Manchester, whilst not directly contributing to the event involving G-XLAG, raised additional concerns. In light of this, the scope of the investigation was extended to include the manner in which MA plc and NATS had planned and managed the rubber removal operation. The operator, MA plc and NATS have now taken considerable steps to address most of the issues raised in this report. Six safety recommendations are made. Causal factors The crew of G-XLAG did not realise that Runway 06L was operating at reduced length due to work-in-progress at its far end, until their aircraft had accelerated to a speed approaching the rotate speed (VR), despite: Being in possession of a NOTAM concerning the work-in-progress The ATIS broadcast relating to the work-in-progress ATC passing information on the takeoff distance available At this point, the aircraft was approaching seven vehicles on the runway and was at a position which precluded an abort within the useable runway length remaining.

Conclusion

the AAIB's conclusion, verbatim
Causal factors The crew of G-XLAG did not realise that Runway 06L was operating at reduced length due to work-in-progress at its far end, until their aircraft had accelerated to a speed approaching the rotate speed (VR), despite: • Being in possession of a NOTAM concerning the work-in-progress • The ATIS broadcast relating to the work-in-progress • ATC passing information on the takeoff distance available At this point, the aircraft was approaching seven vehicles on the runway and was at a position which precluded an abort within the useable runway length remaining.  Factual Information 1.1 History of flight The aircraft was operating a charter flight, flight number XLA 2146, from Manchester Airport to Kos in Greece, with a total of seven crew and 190 passengers on board. The scheduled departure time for the flight was 1355 hrs. In accordance with company procedures, the cabin crew reported for duty at 1225 hrs, one and a half hours prior to the scheduled departure time, at the company’s crew room in Terminal Two at Manchester Airport. Having completed their briefing they made their way to the aircraft to carry out the cabin security and safety checks prior to boarding passengers. The two pilots were due to report for duty at 1255 hrs, one hour before the scheduled departure time. The co-pilot arrived at about 1240 hrs and started to collect together the required paperwork for the flight. He then received a telephone call from the commander who explained that, due to traffic delays on his journey to the airport, he would be reporting slightly late. The co-pilot subsequently received a telephone call from the aircraft refuellers requesting the amount of fuel required, so that refuelling of the aircraft could commence. In an attempt to prevent any delays the co-pilot took it upon himself to calculate the fuel load required by reference to the flight plan, the enroute and destination weather forecasts and the destination NOTAMs. He did not however check for any NOTAMs relating to Manchester Airport, as he did not consider this necessary to complete the fuel calculation. Having completed his calculation the co-pilot passed the fuel quantity required to the refuellers by telephone and then left the crew room to make his way to the aircraft, a walk of approximately ten minutes. The commander arrived about ten minutes after the scheduled report time and met the co-pilot as he was leaving the crewroom. The commander stated he checked the fuel figures at that time by reference to the flight plan and weather forecasts for the destination and alternate airports; however he did not read the relevant NOTAMs, deciding instead to check them once he was on the aircraft. Once at the aircraft the co-pilot placed the flight paperwork on the flight deck instrument panel and went outside to complete the external checks. The commander remained on board to program the Flight Management System  NOTAM – Notice To AirMen. NOTAMs are documents containing pertinent information for pilots when in the planning stages of a flight.  (FMS). On completing the external checks, the co-pilot returned to the flight deck to continue his part of the pre-flight preparations. This included, as laid down in the standard operating procedures (SOPs), listening to the departure ATIS and copying the information onto the flight log. This was then used by the commander to complete the programming of the FMS. The commander did not recall listening to the ATIS, stating he referred only to the information written by the co-pilot on the flight log. The co-pilot stated that whilst he listened to the ATIS he may well have been interrupted by other pre-flight activities going on at the time. ATIS information ‘Romeo’ was current at the time and broadcast as follows: “this is manchester departure information romeo at time er one two five zero the runway in use for departing aircraft is zero six left wind is zero seven zero degrees thirteen knots weather cavok air temperature plus twenty-nine, dewpoint plus fifteen qnh one zero zero five millibars pilots be advised intense bird activity has been reported in the vicinity of both runways pilots should also be advised due to work in progress on zero six left stop end reduced take off run available for zero six left is one thousand nine hundred and twenty- six metres from time thirteen hundred zulu to fourteen thirty zulu aircraft unable to accept reduced take off run available are to advise delivery on first contact to arrange a departure on zero six right report aircraft type and departure information romeo received on first contact with manchester out” The flight log showed that only part of the departure ATIS had been copied, which was written in the appropriate section, as follows: R 06L 070/13 CAVOK 29/15 1005 No record was found on any of the relevant paperwork of either the bird activity or the work-in-progress.  At 1339 hrs, the
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.