UK AAIB AAIB-2003-GMANS · UK AAIB · Field investigation
BAe 146-200,
Brussels Airport, Brussels · 2003-03-30·G-MANS
Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
—
damage
What happened
AAIB synopsis, verbatimBAe 146-200, G-MANS
Conclusion
the AAIB's conclusion, verbatimDiscussion The aircraft's rate of descent increased following the deployment of the airbrake at 125 feet agl and by 70 feet agl it had developed to about 900 fpm. In the absence of the 15 parameters not recorded on the FDR it is not possible to say with certainty what might have contributed to this increase. However, the engine thrust recalled by the flight crew was set to a low value. The reported surface wind at touchdown was 80º to the right of the runway heading and steady at 13 kt. The FO initiated the flare after the aircraft had crossed the threshold and later made a more positive input on the controls, just prior to the aircraft landing, when he realised that the rate of descent was higher than normal. At touchdown the aircraft's recorded pitch attitude was 10.6º and the tail bumper struck the runway. The contact area and damage was limited to the tail bumper. Information from the manufacturer, coupled with the pitch attitude recorded on the FDR, implies that the main landing gear contacted the runway surface fractionally before the tail bumper. It also suggests that contact between the aircraft skin, in the area of Frame 38, and the runway was narrowly avoided. During the latter stages of the approach the rate of descent and the pitch attitude had both increased, whilst the aircraft maintained the glideslope with a low thrust setting. This suggests that the airspeed had reduced to a lower value than the flight crew had realised, and this low energy state is confirmed by operation of the aural stall warning. Since this incident the operator has issued extra guidance to crews operating this aircraft type. This includes the need to monitor carefully the airspeed and power setting during the final approach and the need for pilots to consider a go-around when they are aware of a high sink rate during the flare, rather than increase the flare. The Operator is also considering a review of the serviceability testing carried out on the type of FDR used in G-MANS to improve the probability of recovering all the parameters that are recordable.
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.