FlarePath
UK AAIB AAIB-2003-GLEDA · UK AAIB · Field investigation

Robinson R22 BETA

Behind Silver Bull Café A10, at Reed near Royston, Hertfordshire · 2003-04-27·G-LEDA

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
—
fatal
—
serious
—
highest injury
Destroyed
damage

What happened

AAIB synopsis, verbatim

Robinson R22 Beta, G-LEDA

Conclusion

the AAIB's conclusion, verbatim
Discussion Belts are manufactured and fitted as matched pairs; as part of the manufacturing process all belts are broken in for five hours at full RPM and tension before shipment. Previous failures have not been associated with belt manufacturing or quality issues. The only consistent factor identified by the manufacturer has been that the failures almost always occur with relatively new belts with less than 50 hours and most with less than 20 hours time-in-service. Initiation is thought to be either a belt strand coming out of a groove or rolling over in a groove, leading to an overload condition which tears the belt apart. The previous problems have been associated with some combination of the following: high or above gross weight power applications (sometimes compounded by turbulence), sheave alignment at installation or alignment shifts caused by initial belt wear in, sheave surface condition (new belts on worn or corroded sheaves), actuator tension out of specification, or excessive belt slack at initial engagement, allowing a belt strand to be outside of the forward or aft groove when tensioned. New belts are soft and tend to grip the sides of the grooves, increasing their tendency to 'climb out' of the sheave.
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.