0
fatal
0
serious
No injury
highest injury
—
damage
What happened
AAIB synopsis, verbatimEmbraer EMB-145EP, G-EMBD
Conclusion
the AAIB's conclusion, verbatimAnalysis From the examination of the tyre, it was clear that the tread failure occurred as a result of overstress. The most likely reason was that the tyre had run whilst under inflated. This had allowed the side walls of the tyre to become stressed leading to the failure of the casing plies, and subsequent penetration of the inner liner, allowing the remaining air pressure to permeate through the plies and lift off the tread package. The tread had then separated at the point of take-off rotation which is when the tyre would have been under its greatest centrifugal force. Fortunately, secondary damage to the aircraft was limited to the wiring at the base of the main landing gear. However, because the Embraer 145 has rear mounted engines, it is feasible that rubber debris could have been ingested by an engine at a critical stage of the takeoff, thereby compounding the seriousness of the incident. The under inflation of the number 2 tyre was probably caused by an extensive leakage of air from the overpressure valve. The leak rate was sufficient that during the intervening 37 hours since the last pressure check, the tyre pressure may have decayed to a level that critically over stressed the tyre sidewall during the subsequent taxi and take-off flight phases. It is also possible that the leak had caused the tyre to run under-inflated on previous flights, progressively reducing the structural strength in the tyre's sidewall prior to the incident flight. The reason for the leakage was corrosion of the over inflation valve seat caused by the absence of an adequate protective anodising layer in that area. The failure of the anodising may have been due to a contaminant being present during the application of the layer at manufacture, as the preparation process at the time was a manual wash and rinse. Recent automation of the cleaning process has significantly reduced the risk of recurrence. It was also discovered that the O-ring seal for the overpressure valve had been in place for a long time, having only been disturbed once during the wheel's lifetime. The seal had degraded, possibly due to the use of an incompatible lubricant and its length of time fitted to the wheel. These factors may have allowed moisture to penetrate past the seal and facilitate the corrosion of the aluminium. The CMM requires an inspection of the wheel assembly at every tyre change. However the inspection is carried out whilst the valves are still fitted, thus preventing a full inspection of the entire wheel, and in particular the corroded area on the affected wheel. The only opportunity for an inspection of the affected area would be during inspection of the valve and replacement of its O-ring seal but the CMM does not require an inspection of the valve seat area. On the defective number 2 wheel assembly, the over inflation valve was only removed once; this was during an overhaul and the O-ring seal was replaced at that time. This would have been the only occasion that the valve seat could have been visually inspected; it is not known if the corrosion was present at that time. The work carried out on the number 2 wheel was in variance to the CMM which required the replacement of the O-ring seals and inspection of the overpressure valve at every tyre change. Discussion with overhaul organisations involved revealed that it was standard practice to disturb the over inflation valve only at overhaul which was every 5th tyre change. This variance may have been attributable to an ambiguity in the CMM. Although there are several references to replacing the O-ring seals, the note in CHECK paragraph 1.H states that replacement is recommended whereas paragraph 1.I requires replacement at every tyre change. Had the over inflation valve been removed and its O-ring seal replaced at each tyre change, it is possible that the corrosion would have been noticed and the wheel assembly scrapped. Therefore, it was recommended that:
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team