What happened

AAIB synopsis, verbatim

HS.748 Series 2A, G-OPFW

Conclusion

the AAIB's conclusion, verbatim
Discussion The operation from CDG was unusual in that it was the first time the company were expected to operate, for an extended period, with crews based in mainland Europe. The crew arrived at CDG with little or no specific briefings on their expected area of operations. The commander had signed that he had read and understood the briefing material that had been provided but in reality he had limited opportunity to study it. The crew were called within their minimum rest period and tasked to fly a route that, although planned to fly around the Alps, resulted in them crossing the Alps in an aircraft limited to a ceiling of 15,000 feet. Additionally they were to operate from two airfields that neither had operated from before. Although company crews are qualified to operate within the company's AOC region and assessed as competent during routine checks, many of them had limited overseas flying experience. The ' region specific' training given to the aircraft commander did not appear to have fully complied with the requirements of ANO Schedule 10, Part B paragraph (5). At Pisa the crew were uncertain as to how to proceed on their flight plan route with an MSA higher than the aircraft ceiling. Furthermore, inconsistencies regarding the meaning of the phrase 'minimum safe altitude for that route' may have enhanced their concerns. They decided however to accept the route and fly the aircraft at a level higher than the aircraft's authorised ceiling. This decision may have been influenced by a desire to achieve the task and a reluctance to delay the flight further, planning a new route. It is not possible to say whether this was due to pressure that was self generated or company imposed, nevertheless the resultant anxiety produced a far from ideal environment detrimental to considered decision making. Direct communication with company operations in Liverpool however, may have resolved the situation, helped to clarify their priorities and removed any doubts the crew had regarding the flight planned route. Once airborne, the crew's situational awareness was degraded as they attempted to establish a clear idea of their routing. Their overall capacity was also possibly reduced and workload increased by the lack of an autopilot fitted to the aircraft. Much of their concentration was taken with attempting to locate waypoint CANNE and it is probable that this, combined with their lack of local knowledge and ATC procedures, influenced their decision to accept a re-route which did not meet the single-engine stabilising altitude requirements. Confusion regarding their position was further enhanced by the unexpected GPWS warning. Their reaction to this was timely and in accordance with company procedures. It was unfortunate however that initiating a climb placed the aircraft in conditions conducive to severe icing. Both situations were very serious in nature yet the crew did not declare an emergency. Had they done so ATC would have been able to renew the crew's confidence of their position, offer assistance and suggest alternative solutions. Suitable pre-deployment preparation by the crew and more in depth briefing and training by the company could, for the most part, have pre-empted these situations and allayed the concerns of this and other crews within the company. Additionally, monitoring by the CAA of the training required for Document title the company to adequately prepare its crews for the scale of this European freight operation may have assisted the company in their preparation. Follow-up action As a result of this incident the company has reviewed and changed aspects of its training policy. Prior to departing on a CDG operation, crews now receive classroom training on European meteorology, ATC, navigation, MSA awareness, performance and technical matters. Attendance at this training is recorded on the individual's training file. The information pack, numbered copies of which are now distributed to all crews, has also been amended to include a complete section highlighting these same subjects. The company have also instigated a full check of all the PLOG's produced. Several discrepancies have been discovered and errors concerning MSA's have been corrected. Additionally the company is in the process of evaluating several automated flight planning systems with the intention of converting to the most suitable in the future. Notwithstanding the above the following
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.