UK AAIB AAIB-2001-GMONS · UK AAIB · Field investigation
Airbus A300B4-605R
In cruise, near Casablanca, Morocco · 2001-05-18·G-MONS
Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
Minor
damage
What happened
AAIB synopsis, verbatimAirbus A300B4-605R, G-MONS, 18 May 2001
Conclusion
the AAIB's conclusion, verbatimThe failure of the No 2 engine was caused by thermally induced fatigue cracking of the HPT Stage 2 NGV aerofoils around the aerofoil outer fillet. This allowed the NGV segment at the 12 o'clock position to 'sag' backwards and 'machine' notches in the HPT Stage 2 blades, ultimately causing the separation of a single blade due to fatigue and tensile overload. All of the HPT Stage 2 NGVs installed on the engine were post-G29/G30 modification standard, the standard which are prone to cracking of the aerofoil outer fillet. An additional factor was the fact that many of the NGV sections, but in particular the NGV segment at the 12 o'clock location, had been multiple-repaired, which further increased the probability of outer fillet cracking. According to Service bulletin CF6-80C2 S/B 72-0952 Revision 4, the inspection of the HPT Stage 2 NGVs could be performed at the operator's convenience. The HPT on the G-MONS No 2 engine was boroscope inspected 237 cycles prior to the incident, but the Stage 2 NGVs were not inspected at that time. It is possible that, had the NGVs been inspected on this occasion, the aerofoil outer fillet cracking might have been identified and the incident could have been prevented. The engine manufacturer's recommendation that operators inspect the non-G29/G30 nozzles was not assigned a higher level of significance as, prior to the G-MONS event, there was no significant history of engine failures due to HPT Stage 2 NGV aerofoil outer fillet cracking. The HPT case withstood the initial event of the release of a single HPT Stage 2 aerofoil and therefore met the engine certification requirements in this respect. However, LPT case penetrations in the planes of the LPT Stages 1 and 4, and LPT case rub-through in the plane of the LPT Stage 5, subsequently occurred due to the cascade of damage caused by engine debris travelling rearwards through the engine. This and previous events give cause for concern that, whilst the CF6-80C2 LPT case may satisfy the certification design requirement to contain a single blade-off, it cannot, in some cases, contain the debris subsequently generated within the LPT case as a consequence of an initial failure further upstream in the engine. This is particularly true for the LPT Stage 5 case rub- through condition, which was an unforseen failure mode and for which the LPT case was not designed. In-service experience of actual failures suggests that further improvements in LPT containment capability are desirable, and that these need to address the LPT case rub-through failure mode.
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 2 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.