AAIB synopsis, verbatim

Embraer EMB -145, G-EMBP, 2 March 2001 at 1745 hrs

Conclusion

the AAIB's conclusion, verbatim
Discussion The evidence clearly indicated that the NLG axle had failed as a result of severe overheating, which had been generated by Bearing 2 having operated in a grossly deteriorated condition. Local embrittlement and cracking had led to rapid fracturing of the axle, probably under normal loading. There had been previous cases of wheel bearing deterioration and axle 'over temperature' on EMB- 145 nose landing gears, attributed to dirt and water ingress into the bearings. In this case the double seals incorrectly fitted at three of the bearing positions had caused distortion and abnormal wear of the seals and severe degradation of the standard of bearing sealing. This would have allowed worn seal material accompanied by external dirt and water to enter the No 2 Bearing and it was possible that this had caused the bearing deterioration that led to the accident. Alternatively the incorrect assembly could have resulted, through in service use, in reduced bearing pre-load and unloading of the inboard bearing cone resulting in roller skewing and subsequent bearing lock-up. The detailed causes of the incorrect installation could not be determined. There had clearly been confusion over the different standards of seal / deflector configuration that may have been brought about by the fact that 'wheel assembly' part numbers had not been changed to reflect the introduction of the wheel assembly modification. This could have been resolved by reference to the BF Goodrich Service Bulletin 3-1551-32-2, introducing the updated seal / deflectors, that stated in para D, that 'the new seal assembly will replace the current inner and outer wheel half seal assemblies, PN 68-1157, and the water deflector shield, PN 72-290 (currently used only on the inboard side of the wheel assembly)'. The SB was however generally clear, and included a figure showing the parts layout. Furthermore, the note in the SB stating that 'if desired, current seal assemblies, P/N 68-1157, and water deflector shields, P/N 72-290, that are in serviceable condition can continue to be installed' did not seem to have been a factor in this case. Operator's post accident actions Following the accident the operator inspected the nose landing gear axles on its EMB-145 aircraft for damage. There was subsequently an inspection for the correct installation of wheel bearing seal / deflectors. No discrepancies were found. The operator also issued an Alert Quality Assurance Notice and applied decals to the nose landing gear doors aimed at raising awareness of the different seal / deflector standards for the nosewheel as described in the Aircraft Maintenance Manual. The operator subsequently specified fitment of only the latest standard of seal/deflector when nosewheels were replaced. Manufacturer's post accident action On 9 March 2001, immediately following the accident, the manufacturer released a Field Report (No GST-0773/01) to all EMB-145 operators re-emphasising that NLG bearing inspections should be carried out in accordance with the BF Goodrich Component Maintenance Manual (CMM) 32- 49-04. This document brought to the attention of operators and maintenance organisations the need to adhere strictly to the inspection criteria and recommended that maintenance personnel pay attention to the contents of Service News Letter 145-32-0016 Revision 1. It did not however mention the fact that incorrect assembly was the cause of the bearing failure. On 12 December 2001, BF Goodrich issued a revision to CMM (32-49-04) to provide specific continued maintenance procedures and incorporated the newer standard integrated seal/water deflector part numbers in the illustrated parts list. The use of the abbreviation 'Opt' however in the Illustrated Parts List listing ('27 72-290........Shield, Water Deflector (Opt to item 30A)') could still lead to confusion as it could be taken to mean either that 'Item 27' is an alternative or an addition ('optional extra') to 'Item 30A'. On 22 February and 28 May 2002, Embraer revised the Aircraft Maintenance Manual (AMM) chapter 32-49-05, with two changes both specifically highlighting the proper assembly of the two different bearing/seal configurations. The mention of 'WATER DEFLECTOR' in section 3-J of the document however appears inconsistent with the caution in Section 1-J and not does reflect the post modification standard which uses two seal/water deflector shields. It is however clarified in Section 3-J(3) but it is considered that the wording could still create a misunderstanding. In addition the Service Bulletin 3-15551-32-2 Revision 1 issued 10 May 2000 incorporated within Service News letter 145-32-0016 Revision 1 issued 24 July 2000 has not been amended to remove the ambiguous statement regarding the continued use of the 'current seal assemblies and water deflector shields'. It the light of the above the following recommendation is made: Recommendation No 2002-09 It is recommended that
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.