FlarePath
UK AAIB AAIB-2001-EIHCI · UK AAIB · Field investigation

Boeing 727-225RE

London Luton Airport · 2001-09-14·EI-HCI

Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
NONE
damage

What happened

AAIB synopsis, verbatim

Boeing 727-223RE, EI-HCI

Conclusion

the AAIB's conclusion, verbatim
Analysis Two separate errors occurred during the loading of this aircraft. The first concerned the mis- identification of two containers that became transposed in the loading order. Two of the containers loaded were initially identified by a verbal transmission of numbers. This was not in accordance with normal procedure. This error alone however would not have caused a significant problem. The second error was that the floor locks were not reset for the outbound load, which led to the subsequent incorrect positioning of the containers within the aircraft. The configuration of the aircraft locks from Copenhagen to Orebro matched that for the loading out of Luton. It is most likely that the locks were left in position after the offload at Orebro, and were never again effectively checked. The ramp co-ordinator was responsible for the loading of the aircraft, but he was not aware of the extent of this responsibility, believing that personnel from another company had overall control. His supervision from the ground was in accordance with company procedures, but did not place him in a position to see the actual location of the containers on board the aircraft. This was compounded by the subsequent failure to reconcile the final load on board with the loadplan, which led to the aircraft being despatched in a significantly out of trim condition. The flight crew, having passed V1, and thereby having passed the point where a stop decision could safely be made, were confronted with the possibility that the aircraft might not be able to fly. The action taken by the commander was to run the stabiliser trim, which moves at a rate of one unit per two seconds. The degree of loading error meant that an additional two units were required for the correct trim setting. The elapsed time before the aircraft was properly configured was thus four seconds from initiation of the stabiliser trim. Rotation commenced at five seconds after Vr and lift- off was some eight seconds after that. Despite flight test data having shown that up to three units of mistrim should be manageable, on this occasion the stick was held to almost the full aft position without any observable response from the aircraft. A subsequent problem was that once having established that the aircraft was controllable in flight, this could then change as a result of fuel burn or a change of configuration. The commander of the aircraft accepted the responsibility for the correct loading of the aircraft by signing the loadsheet, but in practice he had to rely on third parties to ensure that procedures had been followed. Two errors arose separately as a result of failures within the loading procedures themselves and in deviations from them. On this occasion, a simple visual comparison of the loaded aircraft against the loadplan would have showed up the discrepancy. The evidence from this incident is that shortcomings that directly affect flight safety exist within the procedures and common practices of UK cargo handling companies. It could not be determined whether the three minute silence period interrupted any part of the loading procedure, but it was a departure from normal airfield operations and thereby may have constituted a distraction.
In FlarePath for this case

What an account opens

The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.