UK AAIB AAIB-2000-VPCDA · UK AAIB · Field investigation
BAC ONE ELEVEN 475
London Luton Airport · 2000-02-28·VP-CDA
Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
—
damage
What happened
AAIB synopsis, verbatimBAC 1-11 475 Series, VP-CDA
Conclusion
the AAIB's conclusion, verbatimAnalysis The original opinion of the on-board engineer that there had been minimal loss of fluid from No 1 hydraulic system during the flight from Brindisi was undoubtedly coloured by the (subsequently found to be erroneous) satisfactory reading on the cockpit quantity gauge. In fact, the quantity of fluid found necessary to replenish the reservoir after the flexible hose change strongly suggests that it was virtually empty, which is consistent with the loss of EDP pressure encountered at the top of descent. This is considered significant because of the much greater probability of inducting air into an empty system than would be likely if the reservoir still contained a significant quantity of fluid. Since no other causal factors were identified, it is generally believed that the cause of the NLG collapse was the presence of air in the system, which had not been fully bled after the hose change. As discussed above, even momentary abnormal pressure differentials across a component such as the Steering and Lock Changeover Valve can cause system pressure to be ported to the uplock/downlock jack, following which the weight of the aircraft will lead to collapse of the NLG. Air can be a source of such an imbalance, although the evidence is only circumstantial to indicate that there was air in this particular component. Maintenance manual information It is common practice on most aircraft types for minor leaks of hydraulic fluid, following rectification action, to be addressed by topping-up the reservoir and exercising the flying controls and other services to bleed air from the system. It does not appear to be common to jack the aircraft and perform landing gear retractions. The BAC 1-11 Maintenance Manual (MM) Chapter 29-00 was consulted for guidance. The procedure for the hose replacement was covered in 29-00 Servicing, page 319 paragraph R entitled 'Component or Pipe Failure'. Following replacement of the defective component, this paragraph refers to a further section, MM 29-10 in which operation B1 specifies:- a) Check the fluid level in the reservoir and, if necessary, replenish as detailed in 12-40-0. If the system has been completely drained, fill and prime the system as detailed in 29-00. MM 29-00 contained the instructions for priming the No 1 system using the AC pump. It required the aircraft to be jacked and all No 1 system hydraulic system services to be exercised until the reservoir contents level stabilises. The manufacturer, in further correspondence, was of the opinion that the replenishment of an empty reservoir was analogous to a reservoir replacement or a 'completely drained' system as described above, either of which required exercise of the landing gear according to the MM. Notwithstanding the information in the MM, it would appear that engineers and technicians may not be fully aware of the possible consequences of air remaining in the NLG system after topping-up following a major loss of hydraulic fluid. Accordingly, the AAIB make the following safety recommendation:-
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.