What happened
AAIB synopsis, verbatimBoeing 747-236B, G-BDXP Summary: The flight departed from Boston USA and was inbound to London Heathrow Airport (LHR). The 1800 hrs Terminal Aerodrome Forecast (TAF) for LHR, obtained en-route by the crew, indicated that surface winds could increase to a value in excess of the aircraft crosswind limitation at the expected time of arrival. The crew reviewed the available alternates and decided that London Stansted Airport would be the most suitable in the event of LHR being unavailable.
Conclusion
the AAIB's conclusion, verbatimOn the available evidence, it would appear that whilst carrying out a landing on the margins of permitted cross wind limits, and after the crew had contained successfully an initial veer to the left on touchdown and were in the process of correcting an apparent subsequent swing to the right, the aircraft was caught by a sudden gust which effectively reinforced the corrective rudder pedal being applied at that time, resulting in a violent over-swing to the left. Despite reversal of the rudder pedal, ultimately to 100%, the yaw rate to the left could not be contained, directional control was lost, and the aircraft departed the paved surface. Discussion In this incident despite turbulent conditions, a safe touchdown was made. The crosswind component of the reported wind remained within the aircraft limits endorsed by the manufacturer and used by the operator. However, there may be a significant difference between a reported wind and an actual wind as a result of short-duration gusts and local effects. The loss of control occurred after touchdown. It seems likely that a critical wind change occurred just as the aircraft was transitioning from the speed at which full rudder would be effective to that at which some input from the tiller or possibly differential braking would be required. As the aircraft swung to the left, the nosewheel was at its limit of adhesion and the only further corrective input available would have been differential braking. The crew had not practised this technique and as the swing to the left was very rapid, it may not have been effective in any case. After the incident, the operator revised the crosswind limits to 25 kt on a wet runway and reviewed the training of crosswind landing technique on the type specifically to raise awareness of the use of differential braking. Moreover, since September 2001, the operator has withdrawn its Boeing 747 'Classic' variants from service and all its remaining Boeing 747 aircraft have rudder fine steering enabled. Although Runway 23 was available for the aircraft, albeit with a 20 minute delay, there was no precision approach aid available on Runway 23 and weather conditions were such that the commander considered it desirable to use a precision approach aid. That entailed the use of either Runway 27L or 27R. The crew would have preferred to use Runway 27L because they knew the approach path to Runway 27R would be especially turbulent but they were under the impression that it was not available because of the strictures of the runway alternation scheme. Minimising approach turbulence In strong south and south-westerly wind conditions, turbulence from buildings upwind of the final approach path to Runway 27R can add considerably to a flight crew's workload. Whilst a change of landing runway from 27R to 27L would be unlikely to have any effect on reducing the crosswind component, such a change would significantly reduce flight crew workload during a critical stage of the approach because it would reduce the turbulence encountered. When Runway 27R is the landing runway and the mean southerly crosswind component reaches 25kt, a change to landing on Runway 23 will automatically invoke a change of use for Runway 27R. (Having been the landing runway, it has to become the departure runway in order to allow Runway 23 to be used for landings). Consequently, at times when Runway 27R is the landing runway, runway alternation is one step in the process of changing to landing on Runway 23. 'Out of phase' alternation has the advantage that approaches would then be made primarily to Runway 27L which does not suffer the same turbulence problems on final approach as Runway 27R. This change can be achieved in 30 minutes and so an early change during preparations for landing on Runway 23 would be beneficial. Consequently, the following safety recommendation was made to HAL and Heathrow ATC. Recommendation 2002-07 It was recommended to Heathrow Airport Limited and to Heathrow Air Traffic Control that Runway 27 Left should be the nominated landing runway from the commencement of the promulgation of Runway 23 (three hours prior to start of Runway 23 operations). This will serve to minimise the use of Runway 27 Right during periods of strong south-westerly winds. Response to safety recommendation 2002-07 In March and April 2002 respectively, Heathrow Air Traffic Control and Heathrow Airport Limited notified the AAIB that they would accept the safety recommendation. 1. This was correct at the time of the incident but has since been modified to include night rotation. 2. The DETR responsibilities have now been assumed by the Department for Transport, Local Government and the Regions (DTLR). 3. Runway 5 is no longer in use as an operational runway at Heathrow 4. Aerodrome Control Room Supervisor (a supervisory function usually performed by the ATC Watch Manager)
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.