UK AAIB AAIB-1998-GOOAB-2 · UK AAIB · Field investigation
Airbus A320-231
Tel Aviv Airport, Israel · 1998-04-18·G-OOAB
Open this case in FlarePathSign inThe record below is free to read. An account opens the recorders, the photographs and the Analyst.
0
fatal
0
serious
No injury
highest injury
NONE
damage
What happened
AAIB synopsis, verbatimAirbus A320-231, G-OOAB, 18 April 1998 at 2200 hrs
Conclusion
the AAIB's conclusion, verbatimDiscussion The investigation into the two incidents failed to identify positively the cause of the electrical power interruptions. Two faults were identified on the No 1 IDG, ie the sheared off oil pressure switch wires and the jammed governor adjuster. The IDG manufacturer considered that these defects could not have accounted for the loss of electrical power, however the aircraft experienced no further related problems after the No 1 IDG was changed. This indicated that the problem probably occurred due to an intermittent and unidentified defect associated with the No 1 IDG. The tests on the engineering simulator showed that the commander's PFD, ND and upper ECAM screens blanked out for a time which was considerably more than the duration of the power loss. Airbus indicated that this was due to the displays going through their normal power-up self-test procedure. The FDR data was unsynchronised for about 1.5 seconds in the Tel Aviv incident, which represented the maximum duration of the power cut. It is probable that the actual duration was about 1 second, which would have caused the screens to blank out for some 5-6 seconds, although the crew may have perceived this to be longer as they attempted to understand what was happening at a critical stage in the take off. It was not possible to determine whether the power loss had been a simple OFF-ON sequence (as in test A), or had involved a more complex profile (as in tests B and C). At no time during the tests did the lower ECAM screen blank out, and as both the screen and its associated DMC are supplied from AC bus 2, there was no reason why it should have been affected. Nevertheless, the crews reported that this had occurred in both incidents, and some of the personnel who witnessed the first test at Toulouse thought that they had seen four displays go blank. The tests additionally illustrated the discrepancy that could exist between the messages displayed on the ECAM (after power was restored) and those logged on the PFR. The aircraft manufacturer indicated that a number of factors could have influenced the CFDS operation, the principal one being the fact that the CFDIU was supplied from AC bus 1, and would thus also have been affected by the power interruption. In addition, the individual units affected would have different fault confirmation times, with a fault message being sent only once to the CFDIU. Thus, if the latter had not returned to its operational state at the time that a fault message had been sent, fault registration would not have occurred. It was considered likely that the Master Warning was related in some way to the electrical power interruption. Although the DFDR indicated that the throttles had been retarded 3 seconds after the start of the power interruption and 1.5 seconds before the Master Warning was recorded, it was apparent that the recording of data temporarily ceased for 1.5 seconds after the electrical power was lost. Consequently, the recovery of electrical power to the DFDR may have been accompanied by delays in the resumption of recording fidelity due to data sampling rates and associated transport delays. It was noted that an 'FWC 1' amber ECAM message was observed during the 2.5 and 1.5 seconds power interrupt tests, but with no corresponding PFR ECAM records. In addition, the first officer in the Tel Aviv incident thought he had seen, for a brief instant during the deceleration, a 'T.O. CONFIG' warning in red on the lower ECAM. Since a configuration warning is one of those key warnings which is not inhibited from being displayed during take off between 80 kt and 1,500 feet agl, Airbus were asked if the loss of FWC 1 as a result of the power interrupt on take off could have generated the configuration warning, red Master Warning lights and continuous repetitive chimes. Airbus responded that both FWC 1 and FWC 2 'identically and permanently' monitor the aircraft, and that each FWC independently illuminates half of the Master Warning/Caution attention getters. One FWC assumes priority, and if it fails the other takes over. Both DMCs use FWC 1 by default and if FWC 1 fails, the DMCs 'reconfigure' to FWC 2 (after a certain configuration time). This explanation implied that the loss of FWC 1 should not have led to a configuration warning, Master Warning and repetitive chimes. Airbus could not explain why such warnings should have occurred. However, the fact that an (unexplained) Master Warning was recorded by the DFDR when a Master Warning did not occur during the tests at Toulouse gives credence to the pilots' recollection of events. The DFDR indication that the Master Warning occurred after the commander had closed the thrust levers was, therefore, considered by the AAIB to have arisen from a combination of transport delays and loss of data synchronisation. With the sudden disappearance of the commander's PFD and ND flight displays (and the apparent near simultaneous disappe
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.