AAIB synopsis, verbatimBAe 146-200, G-JEAR
Conclusion
the AAIB's conclusion, verbatimSummary The fatigue induced failure of one stage 3 LP turbine blade had caused secondary failure of three adjacent stage 3 turbine blades, which had then caused secondary failure of all stage 4 LP turbine blades. The resultant LP turbine imbalance had caused the LP shaft to run sufficiently 'bowed' to bring its outer surface into contact with the bore of the HP shaft, which was rotating at higher speed. The HP shaft had been severely overheated, locally, by contact with the LP and had separated at this point as a result. The most probable reason that fatigue initiated in the stage 3 turbine blade was the development of larger than permitted clearances between the tip platforms of adjacent stage 3 turbine blades, a condition which was known to allow the stage 3 turbine blades to suffer excessive vibration. Once initiated, such fatigue was likely to have progressed to blade failure relatively quickly, resulting in the release of the affected outer section of the blade and consequent secondary damage to the remainder of the turbine section of the engine. The wear of the stage 3 turbine blade tip platform contact faces to the point where the clearances between adjacent blades became excessive was a consequence of these blades having been returned to service in September 1997 after the last hot section overhaul, rather than electing to replace these blades with the modified blade type recommended by the manufacturer in Service Bulletin ALF502R 72-279. This Bulletin recommended that the modified type of blade should be fitted when such engines were next returned to a manufacturer's service centre, unless the blade platforms were not worn beyond specified limits. In this case, since SB ALF502R 72-279 was not embodied it would appear that the platform clearances had been assessed to be within the specified limits at overhaul, although no record of related measurements was found. However, the platforms of the refitted stage 3 turbine blades appear to have subsequently worn to the point where they became liable to excessive vibration in less than half the overhaul period since that inspection. In Service Bulletin ALF502R 72-279, the wording of the reason for the introduction of the modified stage 3 turbine blades did not indicate the likelihood of the initiation of related fatigue cracking in these blades, if left unmodified. In addition, it did not give any indication of how serious the secondary engine damage was likely to be if a stage 3 turbine blade suffered a related fatigue failure and separation. The text of the first page of SB ALF502R 72-279 is reproduced at
In FlarePath for this case
What an account opens
AnalyseThe Analyst and the S.I. Assistantone timeline across the recorders, precedent accidents, answers from the 1 documents with the page they came fromKeepCasebook and briefsnotes pinned to the evidence, an investigation brief, a read-only link for your team
The Explorer account is free and reads the whole record. The recorders, the Analyst and the Casebook are the paid plans.